| David Carreon | 800 | 800 | 111 | N/A | Uncommitted | $3,500.00 | $0.00 | $0.00 | Planned maintenance | IT | Technology | Prevent further damage | Deferred | | Low | 2025 | No | |
| David Carreon | 800 | 800 | Network Battery UPS replace | April | Uncommitted | $8,000.00 | $0.00 | $0.00 | Planned maintenance | IT | Technology | Customer Experience | Deferred | | Low | 2025 | No | |
| Austin Webb | 100 | 100 | Market Spare 40 Vac Producer | N/A | | $17,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | Vacuum | | 2026 Request | | High | 2026 | No | |
| Austin Webb | 100 | 100 | Market Chain/Roller Conveyor Rebuild | | | $13,500.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Austin Webb | 100 | 100 | Market Blower Assembly | | | $7,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | Blowers | | 2026 Request | | High | 2026 | No | |
| Austin Webb | 100 | 100 | Mitter Basket Rebuild | | | $5,500.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Austin Webb | 100 | 100 | Mitter Basket Rebuild | | | $5,500.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Austin Webb | 100 | 100 | Wrap Brush Rebuild | | | $5,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Austin Webb | 100 | 100 | Tire Brush Rebuild | | | $4,500.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Austin Webb | 100 | 100 | Tire Brush Rebuild | | | $4,500.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Austin Webb | 100 | 100 | Tire Brush Rebuild | | | $4,500.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Austin Webb | 100 | 100 | Power Pack Rebuild | | | $4,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Austin Webb | 100 | 100 | Power Pack Rebuild | | | $4,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Austin Webb | 100 | 100 | Pump (2) Market Spare Hydraflex F&W Pump | | | $4,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Ryan Payne | 200 | 200 | Market Spare Hydraflex Grundfos Pump | | | $8,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Ryan Payne | 200 | 200 | Market Spare Hydraflex Grundfos Pump | | | $8,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Ryan Payne | 200 | 200 | HVAC | | | $8,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Ryan Payne | 200 | 200 | HVAC | | | $8,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Ryan Payne | 200 | 200 | Market Blower Assembly | | | $7,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | Blowers | | 2026 Request | | High | 2026 | No | |
| Ryan Payne | 200 | 200 | Market Blower Assembly | | | $7,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | Blowers | | 2026 Request | | High | 2026 | No | |
| Ryan Payne | 200 | 200 | Market Blower Assembly | | | $7,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | Blowers | | 2026 Request | | High | 2026 | No | |
| Ryan Payne | 200 | 200 | Market Spare Compressor | | | $5,500.00 | $0.00 | $0.00 | Prevent further damage | Equipment | Compressors Replacement | | 2026 Request | | High | 2026 | No | |
| Ryan Payne | 200 | 200 | Market Spare Compressor | | | $5,500.00 | $0.00 | $0.00 | Prevent further damage | Equipment | Compressors Replacement | | 2026 Request | | High | 2026 | No | |
| Ryan Payne | 200 | 200 | Pump (2) Market Spare Hydraflex F&W Pump | | | $4,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Ryan Payne | 200 | 200 | Pump (2) Market Spare Hydraflex F&W Pump | | | $4,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Ryan Payne | 200 | 200 | Pump (2) Market Spare Hydraflex F&W Pump | | | $4,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Ryan Payne | 200 | 200 | Pump (2) Market Spare Hydraflex F&W Pump | | | $4,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Ryan Payne | 200 | 200 | Power Pack Rebuild | | | $4,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Ryan Payne | 200 | 200 | Power Pack Rebuild | | | $4,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Ryan Payne | 400 | 400 | planned cappex PM budget belt sites | | | $25,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | Conveyor Belt | | 2026 Request | | High | 2026 | No | |
| Ryan Payne | 400 | 400 | Thinner grand entry arches for belt sites- 407, 408, 409, 410 | | | $40,000.00 | $0.00 | $0.00 | Customer Experience | Equipment | Building Facilities | | 2026 Request | | Medium | 2026 | No | |
| Ryan Payne | 400 | 400 | Wrap Brush Rebuild | | | $5,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Ryan Payne | 400 | 400 | Tire Brush Rebuild | | | $4,500.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Ryan Payne | 400 | 400 | Power Pack Rebuild | | | $4,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Austin Webb | | | Camera system (vast upgrade) | | | $3,000.00 | $0.00 | $0.00 | Customer Experience | Equipment | Camera | | 2026 Request | | Low | 2026 | No | |
| Lauren Fine | 300 | 300 | Pump (2) Market Spare Hydraflex F&W Pump | | | $4,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Lauren Fine | 300 | 300 | Blower Assembly | | | $7,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Lauren Fine | 300 | 300 | Tire Brush Rebuild | | | $4,500.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Lauren Fine | 300 | 300 | Wrap Brush Rebuild | | | $5,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Lauren Fine | 300 | 300 | Market Spare 40 Vac Producer | | | $17,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Lauren Fine | 500 | 500 | Power Pack Rebuild | | | $4,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Lauren Fine | 500 | 500 | Power Pack Rebuild | | | $4,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Lauren Fine | 500 | 500 | Market Grundfos Replacement | | | $8,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Lauren Fine | 500 | 500 | Blower Assembly | | | $7,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Lauren Fine | 500 | 500 | Pump (2) Market Spare Hydraflex F&W Pump | | | $4,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Lauren Fine | 500 | 500 | Tire Brush Rebuild | | | $4,500.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Lauren Fine | 500 | 500 | Tire Brush Rebuild | | | $4,500.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Lauren Fine | 500 | 500 | Wrap Brush Rebuild | | | $5,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Benjamin Herr | 700 | 700 | Chain and Roller Conveyor Rebuild | | | $13,500.00 | $0.00 | $0.00 | Prevent further damage | Equipment | Conveyor Chain | | 2026 Request | | Medium | 2026 | No | |
| Benjamin Herr | 700 | 700 | Chain and Roller Conveyor Rebuild | | | $13,500.00 | $0.00 | $0.00 | Prevent further damage | Equipment | Conveyor Chain | | 2026 Request | | Medium | 2026 | No | |
| Benjamin Herr | 700 | 700 | Blower Assembly | | | $7,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Benjamin Herr | 700 | 700 | Pump (2) Market Spare Hydraflex F&W Pump | | | $4,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Benjamin Herr | 700 | 700 | Tire Brush Rebuild | | | $4,500.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Benjamin Herr | 700 | 700 | Wrap Brush Rebuild | | | $5,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Josh McCown | 800 | 800 | EMV Hotspot Upgrade | | | $15,000.00 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | 2026 Request | | Medium | 2026 | No | |
| Caleb Harris | 800 | 800 | Spare Grundfos Replacement | | | $8,500.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | Medium | 2026 | No | |
| Caleb Harris | 800 | 800 | Pump (2) Market Spare Hydraflex F&W Pump | | | $4,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Caleb Harris | 800 | 800 | Tire Brush Rebuild | | | $4,500.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | No | |
| Caleb Harris | 800 | 800 | Spare Market 40 HP Vac Producer (Spencer) | | | $17,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | Medium | 2026 | No | |
| Josh McCown | | 99 | DRB Query Server upgrade Windows 11 | | | $3,000.00 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | 2026 Request | | Medium | 2026 | No | |
| Abel Smith | 100 | 101 | Air Compressor | N/A | Uncommitted | $7,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Compressors Replacement | Wash Quality | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 100 | 101 | Tunnel Liner Wall Panels | N/A | Uncommitted | $14,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Customer Experience | Deferred | | Low | 2025 | No | |
| Austin Webb | 100 | 101 | TCS1 Upgrade | N/A | | $45,000.00 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | 2026 Request | | Low | 2026 | No | |
| Austin Webb | 100 | 101 | Chem room door replacement | | | $7,000.00 | $0.00 | $0.00 | Prevent further damage | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Austin Webb | 100 | 101 | Upgrade XPTs to XPT5+ from XPT 2012 - Replace with SAL use XPT for parts | | | $3,500.00 | $0.00 | $0.00 | Prevent further damage | IT | XPT | | 2026 Request | | Low | 2026 | No | |
| Austin Webb | 100 | 101 | Oval building sign | N/A | Uncommitted | $8,500.00 | $0.00 | $0.00 | Prevent further damage | Building/Site | Facilities Site Work | | Deferred | | High | 2026 | No | |
| David Carreon | 100 | 101 | Tunnel OTT | April | Committed | $3,500.00 | $0.00 | $0.00 | Planned maintenance | | Technology | | Completed | EQ-0101-2026-1771 | High | | No | |
| Abel Smith | 100 | 102 | Chain | N/A | Uncommitted | $13,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | chain/roller | Wash Quality | Deferred | | Low | 2025 | No | |
| Austin Webb | 100 | 102 | TCS1 Upgrade | | | $45,000.00 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | 2026 Request | | Low | 2026 | No | |
| Austin Webb | 100 | 102 | Chem room door replacement | | | $7,000.00 | $0.00 | $0.00 | Prevent further damage | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Austin Webb | 100 | 102 | Upgrade XPTs to XPT5+ from XPT 2012 - Replace with SAL use XPT for parts | | | $3,500.00 | $0.00 | $0.00 | Prevent further damage | IT | XPT | | 2026 Request | | Low | 2026 | No | |
| Austin Webb | 100 | 102 | Conveyor Chain/Rollers | January | Committed | $14,649.00 | $12,304.14 | $2,344.86 | Prevent further damage | Equipment | Conveyor Chain | Prevent further damage | Completed | EQ-0102-2026-1628 | Low | 2026 | Yes | |
| Abel Smith | 100 | 103 | Grandfos - 2 20 GPM Grundfos Pumps - 460V | N/A | Uncommitted | $16,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Hydroflex | Wash Quality | Deferred | | Low | 2025 | No | |
| Abel Smith | 100 | 103 | Tire brush - Poodle brush | N/A | Uncommitted | $4,500.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Hydroflex | Wash Quality | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 100 | 103 | Parking lot restripe | N/A | Uncommitted | $6,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Customer Experience | Deferred | | Low | 2025 | No | |
| Austin Webb | 100 | 103 | Reclaim (one from LA?) | October | Committed | $6,000.00 | $0.00 | $0.00 | Wash Quality | Equipment | | | 2026 Request | | Low | 2026 | No | |
| Austin Webb | 100 | 103 | TCS1 Upgrade | | | $45,000.00 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | 2026 Request | | Low | 2026 | No | |
| Austin Webb | 100 | 103 | Upgrade XPTs to XPT5+ from XPT 2012 | | | $40,000.00 | $0.00 | $0.00 | Prevent further damage | IT | XPT | | 2026 Request | | Low | 2026 | No | |
| Austin Webb | 100 | 103 | Chem room door replacement | | | $7,000.00 | $0.00 | $0.00 | Prevent further damage | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Austin Webb | 100 | 103 | Vacuum turbine | | Uncommitted | $18,514.00 | $0.00 | $0.00 | Prevent further damage | Equipment | Vacuum | | Deferred | | High | 2026 | Yes | |
| Andrew Folse | 100 | 103 | 20gpm Grundfoss Pump | August | Committed | $9,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Hydroflex | Prevent further damage | Ordered | EQ-0103-2026-1932 | High | | No | |
| Abel Smith | 100 | 104 | Mitter Carriage | August | Committed | $5,300.00 | $5,189.54 | $110.46 | Planned maintenance | Equipment | Mitter | Wash Quality | Completed | EQ-0104-2025-1418 | Low | 2025 | Yes | |
| Abel Smith | 100 | 104 | Airlines and plumbing - Overflow vac area | Completed | Uncommitted | $8,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Customer Experience | Completed | | Low | 2025 | No | |
| Mason Faltysek | 100 | 104 | Concrete -Tunnel drainage | N/A | Uncommitted | $5,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Prevent further damage | Deferred | | Low | 2025 | No | |
| Abel Smith | 100 | 104 | Chain - New Rollers | April | Committed | $12,000.00 | $15,483.72 | $-3,483.72 | Planned maintenance | Equipment | chain/roller | Wash Quality | Completed | EQ-0104-2025-1267 | Low | 2025 | No | |
| Austin Webb | 100 | 104 | Door laundry room. | | | $5,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Austin Webb | 100 | 104 | Chem room door replacement | | | $7,000.00 | $0.00 | $0.00 | Prevent further damage | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Austin Webb | 100 | 104 | TCS1 Upgrade | | | $45,000.00 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | 2026 Request | | Low | 2026 | No | |
| Austin Webb | 100 | 104 | Upgrade XPTs to XPT5+ from XPT 2012 - Replace with SAL use XPT for parts | | | $3,500.00 | $0.00 | $0.00 | Prevent further damage | IT | XPT | | 2026 Request | | Low | 2026 | No | |
| Austin Webb | 100 | 104 | Tunnel Drainage | N/A | Uncommitted | $0.00 | $0.00 | $0.00 | Safety | Building/Site | Facilities Site Work | | Deferred | | Medium | 2026 | No | |
| Austin Webb | 100 | 105 | Chem room door replacement | | | $7,000.00 | $0.00 | $0.00 | Prevent further damage | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Austin Webb | 100 | 105 | 105 - CapEx Vac Producer | March | Committed | $18,514.00 | $0.00 | $0.00 | Prevent further damage | Equipment | Vacuum | | Completed | EQ-0105-2026-1660 | High | 2026 | Yes | |
| Austin Webb | 100 | 105 | Air compressor | April | Committed | $5,700.00 | $4,432.71 | $1,267.29 | Prevent further damage | Equipment | Compressors Replacement | Wash Quality | Completed | EQ-0105-2026-1730 | High | 2026 | Yes | |
| Austin Webb | 100 | 106 | Vacuum turbine | March | Committed | $18,514.00 | $17,068.61 | $1,445.39 | Prevent further damage | Equipment | Vacuum | | Completed | EQ-0106-2026-1700 | High | 2026 | Yes | |
| Austin Webb | 100 | 106 | Air Compressor | April | Committed | $5,700.00 | $4,498.75 | $1,201.25 | Wash Quality | Equipment | Compressors Replacement | Wash Quality | Completed | EQ-0106-2026-1731 | High | 2026 | Yes | |
| Mason Faltysek | 100 | 107 | Roof - Gutter down spout | N/A | Uncommitted | $11,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Prevent further damage | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 100 | 107 | Signage - New WW Entrance Arch | N/A | Uncommitted | $12,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | marketing/signage | Customer Experience | Deferred | | Low | 2025 | No | |
| Abel Smith | 100 | 107 | Tire Brush - Replace Ninja Brushes/Rebuild completely | May | Committed | $4,500.00 | $8,866.25 | $-4,366.25 | Planned maintenance | Equipment | Tire Shine | Wash Quality | Completed | EQ-0107-2025-1260 | Low | 2025 | No | |
| Austin Webb | 100 | 107 | Market Chain/Roller Conveyor Rebuild | April | Committed | $15,500.00 | $12,326.55 | $3,173.45 | Prevent further damage | Equipment | | | Completed | EQ-0107-2026-1722 | High | 2026 | Yes | |
| Austin Webb | 100 | 107 | adding gutter down spouts and french drain to tunnel gutters | | | $0.00 | $0.00 | $0.00 | Safety | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Austin Webb | 100 | 108 | Grand Entry Arch (Just Facings) | | | $1,900.00 | $0.00 | $0.00 | Customer Experience | Equipment | Building Facilities | | 2026 Request | | Low | 2026 | No | |
| Rusty Modesty | 100 | 109 | Water Softner - Water softeners (units on-site are small, requesting bigger units like rest of the market- TA) | N/A | Uncommitted | $13,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Water Softener | Wash Quality | Deferred | | Low | 2025 | No | |
| Abel Smith | 100 | 109 | Second Poodle Brush | N/A | Uncommitted | $0.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Wheel Brush | Customer Experience | Deferred | | Low | 2025 | No | |
| Abel Smith | 100 | 109 | Wheel Brush (2) Rebuild | N/A | Uncommitted | $8,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Wheel Brush | Customer Experience | Deferred | | Low | 2025 | No | |
| Austin Webb | 100 | 109 | Gate Exit | N/A | Uncommitted | $10,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | Deferred | | Low | 2026 | No | |
| Abel Smith | 100 | 110 | Blower gators | September | Committed | $12,500.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Blowers | Wash Quality | Completed | EQ-0110-2025-1471 | Low | 2025 | No | |
| Andrew Folse | 100 | 110 | Conveyor Deck Repair | April | Committed | $4,500.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Conveyor Chain | Safety | Completed | EQ-0110-2026-1768 | High | 2025 | No | |
| Abel Smith | 100 | 110 | Convert from Hydra-Flex pumps to Grundfos pumps | N/A | Uncommitted | $17,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Hydroflex | Wash Quality | Deferred | | Low | 2025 | No | |
| David Carreon | 100 | 110 | LED sig controller | N/A | Uncommitted | $5,700.00 | $0.00 | $0.00 | Unplanned | Building/Site | marketing/signage | Customer Experience | Deferred | | Low | 2025 | No | |
| Austin Webb | 100 | 110 | Pump Grundfos (2 20 gpm) | | Uncommitted | $15,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | Deferred | | High | 2026 | Yes | |
| Austin Webb | 100 | 110 | Upgrade XPTs to XPT5+ from XPT 2012 | | | $40,000.00 | $0.00 | $0.00 | Prevent further damage | IT | XPT | | 2026 Request | | Low | 2026 | No | |
| Austin Webb | 100 | 110 | Sign LED | September | Committed | $12,000.00 | $0.00 | $0.00 | Customer Experience | IT | Building Facilities | | 2026 Request | | Medium | 2026 | No | |
| Austin Webb | 100 | 110 | Replace ceramic and carnauba light bars | N/A | Uncommitted | $2,500.00 | $0.00 | $0.00 | Customer Experience | Equipment | Building Facilities | | Deferred | | Medium | 2026 | Yes | |
| Austin Webb | 100 | 110 | Grand Entry Arch (full replacement) | October | Committed | $8,600.00 | $0.00 | $0.00 | Customer Experience | Equipment | Building Facilities | | 2026 Request | | High | 2026 | No | |
| Austin Webb | 100 | 111 | Equipment Wrap Rebuild Full Quad | | Uncommitted | $8,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | Deferred | | High | 2026 | No | |
| Abel Smith | 100 | 112 | Hydra-Pulse | N/A | Uncommitted | $3,200.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Conveyor Chain | Wash Quality | Deferred | | Low | 2025 | No | |
| Abel Smith | 100 | 112 | Tire Brush - Replace Ninja Brushes/Rebuild completely | N/A | Uncommitted | $4,500.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Tire Shine | Wash Quality | Deferred | | Low | 2025 | No | |
| Austin Webb | 100 | 114 | Exterior lights (2 building lights & 2 XPT Canopy lights) | N/A | Uncommitted | $6,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | Deferred | | Low | 2026 | No | |
| 0 | 115 | | | | $0.00 | $0.00 | $0.00 | | | | | | | Medium | 2025 | No | |
| Austin Webb | 100 | 115 | Replace 2 tunnel accent lights | | | $3,000.00 | $0.00 | $0.00 | Customer Experience | Equipment | Building Facilities | | 2026 Request | | Low | 2026 | No | |
| Abel Smith | 100 | 116 | Vacuum -Second turbine | N/A | Uncommitted | $5,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Vacuum | Customer Experience | Deferred | | Low | 2025 | No | |
| Abel Smith | 100 | 116 | Tire Brush - Macneil Sonic Brushes or Sonnys Python brushes | N/A | Uncommitted | $18,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Wheel Brush | Wash Quality | Deferred | | Low | 2025 | No | |
| Abel Smith | 100 | 116 | Wrap 2 Cores DS/PS and cloth replacement | January | Committed | $5,500.00 | $5,213.82 | $286.18 | Planned maintenance | Equipment | Wrap Brush | Wash Quality | Completed | EQ-0116-2025-1140 | Low | 2025 | No | |
| Abel Smith | 100 | 116 | Tire Shine Replacement | N/A | Uncommitted | $27,300.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Tire Shine | Wash Quality | Deferred | | Low | 2025 | No | |
| David Carreon | 100 | 116 | LED Sign replacement | N/A | Uncommitted | $5,900.00 | $0.00 | $0.00 | Unplanned | Building/Site | marketing/signage | Customer Experience | Deferred | | Low | 2025 | No | |
| Austin Webb | 100 | 116 | Market Air Compressor | May | Committed | $5,700.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | Completed | EQ-0116-2026-1782 | High | 2026 | Yes | |
| Austin Webb | 100 | 116 | Aqua Labs (or Rebuild of Misers) | August | Committed | $22,000.00 | $1,725.41 | $20,274.59 | Wash Quality | Equipment | | | Completed | EQ-0116-2026-1917 | High | 2026 | No | |
| Austin Webb | 100 | 116 | Vac producer needs to be replaced, two cracks in it. | November | Committed | $18,514.00 | $0.00 | $0.00 | Prevent further damage | Equipment | Vacuum | | 2026 Request | | Medium | 2026 | No | |
| Austin Webb | 100 | 116 | Camera system (vast upgrade) | June | Committed | $8,000.00 | $3,332.58 | $4,667.42 | Safety | IT | Camera | | Completed | EQ-0116-2026-1848 | Medium | 2026 | No | |
| Austin Webb | 100 | 116 | Sign LED | September | Committed | $12,000.00 | $0.00 | $0.00 | Customer Experience | IT | Building Facilities | | 2026 Request | | Low | 2026 | No | |
| Austin Webb | 100 | 116 | replace tri foam light and blower area light | | | $2,700.00 | $0.00 | $0.00 | Customer Experience | Equipment | Building Facilities | | 2026 Request | | Medium | 2026 | No | |
| Abel Smith | 100 | 117 | Tire Seal hub,spindle rebuild | N/A | Uncommitted | $2,800.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Tire Shine | Wash Quality | Deferred | | Low | 2025 | No | |
| Abel Smith | 100 | 117 | Tire Shine | January | Committed | $2,510.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Tire Shine | Wash Quality | Completed | EQ-0117-2024-1089 | Low | 2025 | No | |
| Austin Webb | 100 | 117 | Office roof leak | | | $2,500.00 | $0.00 | $0.00 | Prevent further damage | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Andrew Folse | 100 | 119 | 20gpm Grundfoss Pump | September | Committed | $9,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Hydroflex | Prevent further damage | Ordered | EQ-0119-2026-1933 | High | | No | |
| Abel Smith | 100 | 120 | Blower gators or AreoGates | N/A | Uncommitted | $8,500.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Blowers | Wash Quality | Deferred | | Low | 2025 | No | |
| Austin Webb | 100 | 120 | Power Packs Replacement and division of 9 flow unit to multiple PP/install hydrapulse | January | Committed | $28,000.00 | $42,596.67 | $-14,596.67 | Prevent further damage | Equipment | Hydraulic Power Pack | Prevent further damage | Completed | EQ-0120-2026-1629 | Low | 2026 | No | |
| Austin Webb | 100 | 120 | TCS1 Upgrade | | | $45,000.00 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | 2026 Request | | Low | 2026 | No | |
| Austin Webb | 100 | 120 | Site needs two new air compressors, only running on one as of now | May | Committed | $11,000.00 | $1,138.61 | $9,861.39 | Prevent further damage | Equipment | | | Completed | EQ-0120-2026-1786 | High | 2026 | Yes | |
| Austin Webb | 100 | 123 | 15 tunnel lights out or partially out | April | Committed | $12,500.00 | $5,864.34 | $6,635.66 | Customer Experience | Building/Site | Building Facilities | | Completed | FA-0123-2026-1705 | High | 2026 | Yes | |
| Mason Faltysek | 100 | 125 | Relocate electrical transformer from roof and repair roof | Feb | Committed | $30,000.00 | $25,502.00 | $4,498.00 | Planned maintenance | Building/Site | Building Facilities | Safety | Completed | FA-0125-2025-1206 | Low | 2025 | No | |
| Mason Faltysek | 100 | 125 | Water damage remediation | Feb | Committed | $27,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Prevent further damage | Completed | FA-0125-2025-1207 | Low | 2025 | No | |
| Rusty Modesty | 100 | 125 | Water Softener | May | Committed | $12,000.00 | $14,557.38 | $-2,557.38 | Planned maintenance | Equipment | Water Softener | Wash Quality | Completed | EQ-0125-2025-1298 | Low | 2025 | No | |
| Abel Smith | 100 | 125 | Grandfos - 2 20 GPM Grundfos Pumps - 460V | N/A | Uncommitted | $13,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Hydroflex | Wash Quality | Deferred | | Low | 2025 | No | |
| Abel Smith | 100 | 125 | Wrap Rebuilds (Multiple) | N/A | Uncommitted | $3,250.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Wrap Brush | Wash Quality | Deferred | | Low | 2025 | No | |
| David Carreon | 100 | 125 | | N/A | Uncommitted | $5,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | marketing/signage | Customer Experience | Deferred | | Low | 2025 | No | |
| Austin Webb | 100 | 125 | Repaint the vacuum stands and booms | N/A | Uncommitted | $15,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | | | Deferred | | Low | 2026 | No | |
| Austin Webb | 100 | 125 | Sign Digital | N/A | Committed | $80,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Building Facilities | Safety | Completed | | Medium | 2026 | No | |
| Austin Webb | 100 | 125 | vac turbine | November | Committed | $18,514.00 | $0.00 | $0.00 | Customer Experience | Equipment | Vacuum | | 2026 Request | | Medium | 2026 | No | |
| Austin Webb | 100 | 125 | Grundfos pump | April | Committed | $13,000.00 | $0.00 | $0.00 | Wash Quality | Equipment | | | Completed | EQ-0125-2026-1664 | High | 2026 | Yes | |
| Rusty Modesty | 100 | 126 | Water Softner - Water Softener upgrade | N/A | Uncommitted | $12,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Water Softener | Wash Quality | Deferred | | Low | 2025 | No | |
| Rusty Modesty | 100 | 126 | Tunnel roll up doors | N/A | Uncommitted | $14,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Safety | Deferred | | Low | 2025 | No | |
| Abel Smith | 100 | 126 | Lighting - Upgrade tunnel led lights, ceramic, triple foam and blower lights in the tunnel. | February | Committed | $7,819.79 | $13,484.79 | $-5,665.00 | Planned maintenance | Equipment | Building Facilities | Safety | Completed | FA-0126-2024-1035 | Low | 2025 | No | |
| Abel Smith | 100 | 126 | Chain Rollers X458-Log Chain Conversion | October | Committed | $15,000.00 | $8,950.94 | $6,049.06 | Planned maintenance | Equipment | chain/roller | Customer Experience | Completed | EQ-0126-2025-1489 | Low | 2025 | No | |
| Austin Webb | 100 | 126 | Water softener | October | Committed | $12,500.00 | $0.00 | $0.00 | Wash Quality | Equipment | | | 2026 Request | | Low | 2026 | No | |
| Austin Webb | 100 | 126 | IR Air compressor needs a motor and Head | May | Committed | $5,500.00 | $0.00 | $0.00 | Wash Quality | Equipment | | | Completed | EQ-0126-2026-1785 | High | 2026 | No | |
| Abel Smith | 200 | 201 | Vac producer collecting water (broken undergorund lateral) | Feb | Committed | $25,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Vacuum | Customer Experience | Completed | | Low | 2025 | No | |
| Abel Smith | 200 | 201 | Tire shine brush replacement | N/A | Uncommitted | $23,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Tire Shine | Wash Quality | Deferred | | Low | 2025 | No | |
| Abel Smith | 200 | 201 | Tunnel Poly Replacement | N/A | Uncommitted | $13,500.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Building Facilities | Wash Quality | Deferred | | Low | 2025 | No | |
| Phil Loper | 200 | 201 | Vacuum Producers | March | Committed | $32,000.00 | $34,487.28 | $-2,487.28 | Planned maintenance | Equipment | Vacuum | Customer Experience | Completed | EQ-0201-2025-1194 | Low | 2025 | No | |
| Mason Faltysek | 200 | 201 | Building improvements - Office Refresh (Paint, Drywall Repair, Trim, VCT. | April | Committed | $7,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Prevent further damage | Completed | FA-0201-2025-1315 | Low | 2025 | No | |
| David Carreon | 200 | 201 | Camera System Upgrade/Replacement | March | Committed | $9,000.00 | $8,878.71 | $121.29 | Planned maintenance | IT | Camera | Safety | Completed | EQ-0201-2025-1293 | Low | 2025 | No | |
| Abel Smith | 200 | 201 | New power pack | N/A | Uncommitted | $8,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Hydraulic Power Pack | Wash Quality | Deferred | | Low | 2025 | No | |
| David Carreon | 200 | 201 | XPT Replacement/upgrade | June | Committed | $6,000.00 | $8,878.71 | $-2,878.71 | Planned maintenance | IT | XPT | Customer Experience | Completed | EQ-0201-2025-1293 | Low | 2025 | No | |
| Mason Faltysek | 200 | 201 | Faded Exterior sign replacement | March | Committed | $4,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | marketing/signage | Customer Experience | Completed | | Low | 2025 | No | |
| David Carreon | 200 | 201 | XPT Replacement/upgrade | July | Committed | $6,000.00 | $3,736.56 | $2,263.44 | Planned maintenance | IT | Technology | Customer Experience | Completed | EQ-0201-2025-1399 | Medium | 2025 | No | |
| Ryan Payne | 200 | 201 | TCS1 Upgrade | | | $45,000.00 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 200 | 201 | Grand Entry | October | Committed | $8,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | Building Facilities | | 2026 Request | | Low | 2026 | Yes | |
| Ryan Payne | 200 | 201 | Door Equipment room and frame | August | Committed | $5,000.00 | $0.00 | $0.00 | Safety | Building/Site | Facilities Site Work | | Ordered | FA-0201-2026-1891 | Medium | 2026 | No | |
| Abel Smith | 200 | 202 | Vacuum- Replace underground vac line | Jan | Committed | $15,000.00 | $14,079.22 | $920.78 | Planned maintenance | Equipment | Facilities Site Work | Customer Experience | Completed | EQ-0202-2025-1167 | Low | 2025 | No | |
| David Carreon | 200 | 202 | Camera System Upgrade/Replacement | N/A | Uncommitted | $3,000.00 | $0.00 | $0.00 | Planned maintenance | IT | Camera | Safety | Deferred | | Low | 2025 | No | |
| Abel Smith | 200 | 202 | Tire Shine Machine | N/A | Uncommitted | $20,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Tire Shine | Wash Quality | Deferred | | Low | 2025 | No | |
| David Carreon | 200 | 202 | XPT Replacement/upgrade and SAL | April | Committed | $8,000.00 | $8,943.16 | $-943.16 | Planned maintenance | IT | XPT | Customer Experience | Completed | EQ-0202-2025-1279 | Low | 2025 | No | |
| Mason Faltysek | 200 | 202 | Concrete - Entry Concrete sinking - mud jacking | N/A | Uncommitted | $7,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Prevent further damage | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 200 | 202 | Vac station repaint | N/A | Uncommitted | $4,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Prevent further damage | Deferred | | Low | 2025 | No | |
| Ryan Payne | 200 | 202 | TCS1 Upgrade | | | $45,000.00 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | 2026 Request | | Low | 2026 | No | |
| Andrew Folse | 200 | 202 | Conveyor | December | Committed | $90,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Conveyor Chain | Prevent further damage | Proposal Solicitation | | High | | No | |
| Rusty Modesty | 200 | 203 | Landscape Refresh | N/A | Uncommitted | $8,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Prevent further damage | Deferred | | Low | 2025 | No | |
| Abel Smith | 200 | 203 | Blowers - Addition of 3 blowers | N/A | Uncommitted | $35,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Blowers | Wash Quality | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 200 | 203 | Parking lot restripe | N/A | Uncommitted | $6,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Customer Experience | Deferred | | Low | 2025 | No | |
| Ryan Payne | 200 | 203 | Market Spare 40 Vac Producer | February | Committed | $17,000.00 | $36,026.35 | $-19,026.35 | Prevent further damage | Equipment | Vacuum | Customer Experience | Completed | EQ-0203-2026-1644 | High | 2026 | Yes | |
| Ryan Payne | 200 | 203 | Sinking Concrete | | | $8,500.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 200 | 203 | TCS1 Upgrade | | | $45,000.00 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 200 | 203 | Upgrade XPT to XPT5+ from XPT 2012 | | | $40,000.00 | $0.00 | $0.00 | Prevent further damage | IT | XPT | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 200 | 203 | Lanscaping Major Refresh | June | Committed | $15,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | Completed | FA-0203-2026-1827 | Low | 2026 | No | |
| Ryan Payne | 200 | 203 | Lighting LED lights on street side vacuums (dark during winter) | October | Committed | $10,500.00 | $0.00 | $0.00 | Customer Experience | Equipment | Building Facilities | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 200 | 203 | Blowers. Install (2) to match standard | November | Committed | $25,000.00 | $0.00 | $0.00 | Wash Quality | Equipment | | | 2026 Request | | Low | 2026 | Yes | |
| Rusty Modesty | 200 | 204 | Lanscape refresh | N/A | Uncommitted | $11,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Prevent further damage | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 200 | 204 | Parking lot restripe | N/A | Uncommitted | $6,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Customer Experience | Deferred | | Low | 2025 | No | |
| Abel Smith | 200 | 204 | Replace poodle brush 1 with python brush | N/A | Uncommitted | $15,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Wrap Brush | Wash Quality | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 200 | 204 | XPT 2 gate box bollard | N/A | Uncommitted | $2,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | XPT Gate | Prevent further damage | Deferred | | Low | 2025 | No | |
| Ryan Payne | 200 | 204 | 204-CAPEX Chain/Roller Refit | January | Committed | $13,606.00 | $10,584.93 | $3,021.07 | Prevent further damage | Equipment | chain/roller | Customer Experience | Completed | EQ-0204-2026-1627 | High | 2026 | Yes | |
| Ryan Payne | 200 | 204 | XPT 1 and 2 gate box bollards | N/A | Uncommitted | $5,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | XPT | | Deferred | | Low | 2026 | No | |
| Ryan Payne | 200 | 204 | Landscaping: mulch beds, new plants in drive flower beds, trim trees | June | Committed | $15,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | Completed | | Low | 2026 | No | |
| Ryan Payne | 200 | 204 | Replace grand arch. It is damaged. | October | Committed | $8,000.00 | $0.00 | $0.00 | Customer Experience | Equipment | Building Facilities | | 2026 Request | | Low | 2026 | Yes | |
| Ryan Payne | 200 | 204 | Canopy cloth on canopy structure | April | Committed | $13,000.00 | $12,773.50 | $226.50 | Customer Experience | Building/Site | Facilities Site Work | | Completed | EQ-0204-2026-1704 | Medium | 2026 | Yes | |
| Rusty Modesty | 200 | 205 | Replace Tunnel Heaters | Jan | Committed | $23,500.00 | $13,709.80 | $9,790.20 | Planned maintenance | Building/Site | Building Facilities | Safety | Completed | EQ-0205-2025-1223 | Low | 2025 | No | |
| Abel Smith | 200 | 205 | Plumbing rebuilding for Hydraflex - Restructure of Hydraflex | N/A | Uncommitted | $2,500.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Hydroflex | Wash Quality | Deferred | | Low | 2025 | No | |
| Rusty Modesty | 200 | 205 | Water Softener | N/A | Uncommitted | $14,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Water Softener | Wash Quality | Deferred | | Low | 2025 | No | |
| Phil Loper | 200 | 205 | Conveyor replacement | May | Committed | $85,000.00 | $100,668.58 | $-15,668.58 | Planned maintenance | Equipment | Conveyor Chain | Wash Quality | Completed | EQ-0205-2025-1297 | Low | 2025 | No | |
| Rusty Modesty | 200 | 205 | Landscaping | N/A | Uncommitted | $8,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Prevent further damage | Deferred | | Low | 2025 | No | |
| Abel Smith | 200 | 205 | Vacuum - Double Drop Vacuum Hoses | July | Committed | $11,200.00 | $10,437.41 | $762.59 | Planned maintenance | Equipment | Vacuum | Customer Experience | Completed | EQ-0205-2025-1374 | Low | 2025 | No | |
| Mason Faltysek | 200 | 205 | Lighting - Extra Lighting on Backside of Property | N/A | Uncommitted | $18,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Safety | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 200 | 205 | Parking lot restripe | N/A | Uncommitted | $6,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Customer Experience | Deferred | | Low | 2025 | No | |
| David Carreon | 200 | 205 | Upgrade of TCS (years of abuse) | N/A | Uncommitted | $0.00 | $0.00 | $0.00 | Planned maintenance | IT | Technology | Wash Quality | Deferred | | Low | 2025 | No | |
| David Carreon | 200 | 205 | XPT Replacement/upgrade 2 units | N/A | Uncommitted | $8,000.00 | $0.00 | $0.00 | Planned maintenance | IT | XPT | Customer Experience | Deferred | | Low | 2025 | No | |
| Ryan Payne | 200 | 205 | Water Softener--wash issues | N/A | Uncommitted | $18,500.00 | $0.00 | $0.00 | Wash Quality | Equipment | | | Deferred | | High | 2026 | Yes | |
| Ryan Payne | 200 | 205 | Gutter Downpout to prevent lanscaping washout | | | $3,000.00 | $0.00 | $0.00 | Prevent further damage | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 200 | 205 | Dry Mat Machine for Lower Lot | October | Committed | $6,500.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | Yes | |
| Ryan Payne | 200 | 205 | Equipment Adding VPD to Site and license | N/A | Uncommitted | $2,000.00 | $0.00 | $0.00 | Wash Quality | IT | Technology | | Deferred | | Low | 2026 | No | |
| Ryan Payne | 200 | 205 | 2 Lanes - Upgrade 1 XPTs to XPT5+ from XPT 2012 - Replace 1 XPT with SAL use XPT for parts | June | Committed | $46,000.00 | $9,865.84 | $36,134.16 | Prevent further damage | IT | XPT | Customer Experience | Completed | EQ-0205-2026-1808 | High | 2026 | No | |
| Ryan Payne | 200 | 205 | TCS1 Upgrade | | | $45,000.00 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 200 | 205 | Lanscaping, Multch over crushed granite(Spillout) | | | $10,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 200 | 205 | Light pole Leaning | | Uncommitted | $10,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | Building Facilities | | Deferred | | High | 2026 | No | |
| Ryan Payne | 200 | 205 | Stucco Repair | April | Committed | $20,000.00 | $0.00 | $0.00 | Prevent further damage | Building/Site | Facilities Site Work | | Completed | FA-0205-2026-1759 | Medium | 2026 | No | |
| Ryan Payne | 200 | 205 | Office and Lobby Renovation | April | Committed | $18,000.00 | $19,485.00 | $-1,485.00 | Customer Experience | Building/Site | Facilities Site Work | | Completed | FA-0205-2026-1733 | Medium | 2026 | Yes | |
| Ryan Payne | 200 | 205 | Door Equipment room changed to a roll up door | April | Committed | $4,000.00 | $7,577.50 | $-3,577.50 | Prevent further damage | Building/Site | Facilities Site Work | | Completed | FA-0205-2026-1735 | Medium | 2026 | No | |
| David Carreon | 100 | 205 | XPT & SAL | January | Uncommitted | $18,000.00 | $0.00 | $0.00 | Planned maintenance | IT | XPT | Customer Experience | Deferred | | High | | No | |
| Rusty Modesty | 200 | 206 | Replace Tunnel Heaters | Jan | Committed | $17,500.00 | $20,077.33 | $-2,577.33 | Planned maintenance | Building/Site | Building Facilities | Safety | Completed | EQ-0206-2025-1136 | Low | 2025 | No | |
| Abel Smith | 200 | 206 | Hydraflex - Restructure of Hydraflex | N/A | Uncommitted | $6,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Hydroflex | Wash Quality | Deferred | | Low | 2025 | No | |
| Phil Loper | 200 | 206 | Replacement of jko dry mat machine | N/A | Uncommitted | $7,500.00 | $0.00 | $0.00 | Planned maintenance | Equipment | rug & mat | Customer Experience | Deferred | | Low | 2025 | No | |
| Rusty Modesty | 200 | 206 | Water Softener | N/A | Uncommitted | $14,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Water Softener | Wash Quality | Deferred | | Low | 2025 | No | |
| Abel Smith | 200 | 206 | Mitters | N/A | Uncommitted | $30,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Mitter | Wash Quality | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 200 | 206 | Tunnel Liner Wall Panels | N/A | Uncommitted | $15,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Customer Experience | Deferred | | Low | 2025 | No | |
| Abel Smith | 200 | 206 | Vacuum - Double Drop Vacuum Hoses | July | Committed | $11,200.00 | $9,079.19 | $2,120.81 | Planned maintenance | Equipment | Vacuum | Customer Experience | Completed | EQ-0206-2025-1375 | Low | 2025 | No | |
| Rusty Modesty | 200 | 206 | Lighting - Update/Replace exterior lighting | N/A | Uncommitted | $14,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Safety | Deferred | | Low | 2025 | No | |
| David Carreon | 200 | 206 | XPT Replacement/upgrade 2 units | N/A | Uncommitted | $16,000.00 | $0.00 | $0.00 | Planned maintenance | IT | XPT | Customer Experience | Deferred | | Low | 2025 | No | |
| Ryan Payne | 200 | 206 | Water Softener | N/A | Uncommitted | $18,500.00 | $0.00 | $0.00 | Wash Quality | Equipment | | | Deferred | | High | 2026 | Yes | |
| Ryan Payne | 200 | 206 | Office Renovation | April | Committed | $25,000.00 | $22,732.50 | $2,267.50 | Customer Experience | Building/Site | Facilities Site Work | | Completed | FA-0206-2026-1761 | Low | 2026 | No | |
| Ryan Payne | 200 | 206 | Repair of Dumpster enclosure | | | $3,500.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 200 | 206 | Equipment Adding VPD to Site and license | N/A | Uncommitted | $2,000.00 | $0.00 | $0.00 | Wash Quality | IT | Technology | | Deferred | | Low | 2026 | No | |
| Ryan Payne | 200 | 206 | OTT Tunnel Terminal Control Unit | March | Committed | $4,000.00 | $3,792.96 | $207.04 | Prevent further damage | IT | Technology | Customer Experience | Completed | EQ-0206-2026-1716 | Low | 2026 | No | |
| Ryan Payne | 200 | 206 | 2 Lanes - Upgrade 1 XPTs to XPT5+ from XPT 2012 - Replace 1 XPT with SAL use XPT for parts | | | $46,000.00 | $0.00 | $0.00 | Prevent further damage | IT | XPT | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 200 | 206 | TCS1 Upgrade | | | $45,000.00 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 200 | 206 | Office front door concrete | February | Committed | $6,000.00 | $4,470.37 | $1,529.63 | Prevent further damage | Building/Site | Facilities Site Work | Safety | Completed | FA-0206-2026-1684 | Medium | 2026 | Yes | |
| Ryan Payne | 200 | 206 | Grand Entry Arch | October | Committed | $8,000.00 | $0.00 | $0.00 | Customer Experience | Equipment | Building Facilities | | 2026 Request | | High | 2026 | Yes | |
| Mason Faltysek | 200 | 207 | Roof replacement/remediation | Jan | Committed | $25,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Safety | Completed | FA-0207-2025-1208 | Low | 2025 | No | |
| Mason Faltysek | 200 | 207 | Office refresh | February | Committed | $15,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Customer Experience | Completed | FA-0207-2025-1208 | Low | 2025 | No | |
| Rusty Modesty | 200 | 207 | Replace Tunnel Heaters | February | Committed | $23,500.00 | $24,080.40 | $-580.40 | Planned maintenance | Building/Site | Building Facilities | Safety | Completed | EQ-0207-2025-1134 | Low | 2025 | No | |
| Rusty Modesty | 200 | 207 | Water Softener | N/A | Uncommitted | $14,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Water Softener | Wash Quality | Deferred | | Low | 2025 | No | |
| Abel Smith | 200 | 207 | Replace Entrance Wraps | August | Committed | $30,000.00 | $38,832.97 | $-8,832.97 | Planned maintenance | Equipment | Wrap Brush | Wash Quality | Completed | EQ-0207-2025-1410 | Low | 2025 | No | |
| Mason Faltysek | 200 | 207 | Parking lot restripe | N/A | Uncommitted | $6,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Customer Experience | Deferred | | Low | 2025 | No | |
| Ryan Payne | 200 | 207 | Equipment Adding VPD to Site and license | N/A | Uncommitted | $7,500.00 | $0.00 | $0.00 | Wash Quality | IT | Technology | | Deferred | | Low | 2026 | No | |
| Ryan Payne | 200 | 207 | OTT Tunnel Terminal Control Unit | March | Committed | $4,000.00 | $0.00 | $0.00 | Safety | IT | Technology | Safety | Completed | EQ-0207-2026-1652 | Low | 2026 | No | |
| Ryan Payne | 200 | 207 | TCS1 Upgrade | | | $45,000.00 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 200 | 207 | Grand Entry Arch. It is damaged. | October | Committed | $8,000.00 | $0.00 | $0.00 | Customer Experience | Equipment | Building Facilities | | 2026 Request | | Low | 2026 | Yes | |
| Ryan Payne | 200 | 207 | Lighting LED Tunnel Lights | March | Committed | $10,500.00 | $19,890.94 | $-9,390.94 | Customer Experience | Building/Site | Building Facilities | | Completed | FA-0207-2026-1683 | Medium | 2026 | Yes | |
| Rusty Modesty | 200 | 207 | Water Softener | N/A | Uncommitted | $0.00 | $0.00 | $0.00 | | Equipment | Water Softener | Wash Quality | Deferred | | High | 2026 | Yes | |
| Rusty Modesty | 200 | 208 | Lighting - Update Exterior lighting | N/A | Uncommitted | $14,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Safety | Deferred | | Low | 2025 | No | |
| Ryan Payne | 200 | 208 | Concrete Repair | | | $20,000.00 | $0.00 | $0.00 | Prevent further damage | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 200 | 208 | Tunnel grand entry arch broken | July | Committed | $8,000.00 | $83.77 | $7,916.23 | Customer Experience | Equipment | Building Facilities | | Completed | SI-0208-2026-1856 | Low | 2026 | Yes | |
| Ryan Payne | 200 | 208 | PS Tire brush replacement | N/A | Uncommitted | $23,000.00 | $0.00 | $0.00 | Wash Quality | Equipment | | | Deferred | | Low | 2026 | Yes | |
| Ryan Payne | 200 | 208 | Grundfos (2) 20 gpm | April | Committed | $17,000.00 | $17,034.84 | $-34.84 | Prevent further damage | Equipment | | | Completed | EQ-0208-2026-1719 | High | 2026 | Yes | |
| Ryan Payne | 200 | 208 | Conveyor Chain/Rollers | January | Committed | $14,573.00 | $13,336.47 | $1,236.53 | Prevent further damage | Equipment | Conveyor Chain | Prevent further damage | Completed | EQ-0208-2026-1626 | Low | 2026 | No | |
| Ryan Payne | 200 | 208 | Dry Mat Machine for volume of customer | September | Committed | $6,500.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | Ordered | EQ-0208-2026-1930 | High | 2026 | Yes | |
| Andrew Folse | 200 | 208 | Grundfoss Pump Market Spare | August | Committed | $9,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | high pressure pump | Prevent further damage | Committed | | High | | No | |
| Mason Faltysek | 200 | 209 | Building improvements - Office Wall Water Damage Repair | N/A | Uncommitted | $18,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Prevent further damage | Deferred | | Low | 2025 | No | |
| Abel Smith | 200 | 209 | Vacuum - Double Drop Vacuum Hoses | N/A | Uncommitted | $11,200.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Vacuum | Customer Experience | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 200 | 209 | Concrete - Exit end foundation - Mud jacking | N/A | Uncommitted | $9,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Prevent further damage | Deferred | | Low | 2025 | No | |
| Ryan Payne | 200 | 209 | Power Pack to remove some items from the PECO power pack | | Uncommitted | $15,000.00 | $0.00 | $0.00 | Customer Experience | Equipment | | | Deferred | | High | 2026 | No | |
| Ryan Payne | 200 | 209 | Lobby & Office Renovation--Water Damage | August | Committed | $30,000.00 | $0.00 | $0.00 | Prevent further damage | Building/Site | Facilities Site Work | | Proposal Solicitation | | Low | 2026 | No | |
| Ryan Payne | 200 | 209 | Building Foundation Issue on back of part of building near equipment room door | N/A | Uncommitted | $20,000.00 | $0.00 | $0.00 | Prevent further damage | Building/Site | Facilities Site Work | | Deferred | | Low | 2026 | No | |
| Ryan Payne | 200 | 209 | Exterior Painting | | | $25,000.00 | $0.00 | $0.00 | Prevent further damage | Building/Site | | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 200 | 209 | Vac 6 New Vac Stalls, Vac Enclosure, Producer | | | $60,000.00 | $0.00 | $0.00 | Customer Experience | Equipment | Vacuum | | 2026 Request | | Low | 2026 | No | |
| David Carreon | 200 | 210 | Module Screens for all gates | March | Committed | $5,500.00 | $2,599.50 | $2,900.50 | Planned maintenance | IT | Technology | Customer Experience | Completed | EQ-0210-2025-1250 | Low | 2025 | No | |
| Rusty Modesty | 200 | 210 | Roofing gutter change - Tunnel puddling concrete cutting | N/A | Uncommitted | $4,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Prevent further damage | Deferred | | Low | 2025 | No | |
| Rusty Modesty | 200 | 210 | Water softener installed | N/A | Uncommitted | $14,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Water Softener | Wash Quality | Deferred | | Low | 2025 | No | |
| Rusty Modesty | 200 | 210 | Landscape update | N/A | Uncommitted | $8,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Prevent further damage | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 200 | 210 | Tunnel Liner Wall Panels | N/A | Uncommitted | $15,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Customer Experience | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 200 | 210 | Lot Restriping | N/A | Uncommitted | $6,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Customer Experience | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 200 | 210 | Paint - Repaint (existing paint peeling) | May | Committed | $2,800.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Prevent further damage | Completed | FA-0210-2025-1317 | Low | 2025 | No | |
| Mason Faltysek | 200 | 210 | Paint - Vacuum Stall Repaint | May | Committed | $10,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Customer Experience | Completed | FA-0210-2025-1317 | Low | 2025 | No | |
| Abel Smith | 200 | 210 | Tire Brush - Install Tire Brush | N/A | Uncommitted | $30,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Tire Shine | Wash Quality | Deferred | | Low | 2025 | No | |
| David Carreon | 200 | 210 | XPT Gate | N/A | Uncommitted | $8,000.00 | $0.00 | $0.00 | Planned maintenance | IT | XPT Gate | Customer Experience | Deferred | | Low | 2025 | No | |
| Ryan Payne | 200 | 210 | Water Softner New Unit | | Uncommitted | $18,500.00 | $0.00 | $0.00 | Customer Experience | Equipment | | | Deferred | | High | 2026 | Yes | |
| Ryan Payne | 200 | 210 | Office remodel: cupboards/desks/draws | | | $16,500.00 | $0.00 | $0.00 | Customer Experience | Building/Site | | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 200 | 210 | Extend gutter tunnel exit asphalt | | | $5,000.00 | $0.00 | $0.00 | Safety | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 200 | 210 | Landscaping: mulch beds, new plants in drive flower beds, trim trees | June | Committed | $15,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | Completed | FA-0210-2026-1830 | Low | 2026 | No | |
| Ryan Payne | 200 | 210 | Touch up brown paint peeling in lot on canopies and central vacuum walls | | Uncommitted | $20,500.00 | $0.00 | $0.00 | Customer Experience | Building/Site | | | Deferred | | High | 2026 | No | |
| Ryan Payne | 200 | 210 | Grand Entry arch sign | October | Committed | $8,000.00 | $0.00 | $0.00 | Customer Experience | Equipment | Building Facilities | | 2026 Request | | Low | 2026 | Yes | |
| Ryan Payne | 200 | 210 | Equipment poodle brush | March | Committed | $22,257.70 | $23,255.80 | $-998.10 | Wash Quality | Equipment | | | Completed | EQ-0210-2026-1691 | Low | 2026 | Yes | |
| Ryan Payne | 200 | 210 | Wrap Replacement | N/A | Uncommitted | $39,000.00 | $0.00 | $0.00 | Wash Quality | Equipment | | | Deferred | | High | 2026 | Yes | |
| Rusty Modesty | 200 | 210 | Mitter Replacement | N/A | Uncommitted | $15,500.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Mitter | Wash Quality | Deferred | | High | | No | |
| Mason Faltysek | 200 | 211 | Paint - Repaint (existing paint peeling) | May | Committed | $22,200.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Prevent further damage | Completed | | Low | 2025 | No | |
| Phil Loper | 200 | 211 | Replace wraps | September | Committed | $40,000.00 | $45,959.01 | $-5,959.01 | Planned maintenance | Equipment | Wrap Brush | Safety | Completed | EQ-0211-2025-1464 | Low | 2025 | No | |
| Phil Loper | 200 | 211 | Mitter Replacement 2 | October | Committed | $30,000.00 | $41,208.36 | $-11,208.36 | Planned maintenance | Equipment | Mitter | Customer Experience | Completed | EQ-0211-2025-1467 | Low | 2025 | No | |
| Ryan Payne | 200 | 211 | Office Remodel | | | $25,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 200 | 211 | Landscape Islands/Grass Repair | June | Committed | $15,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | Completed | FA-0211-2026-1831 | Low | 2026 | No | |
| Ryan Payne | 200 | 211 | Exterior Painting | | | $10,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 200 | 211 | Wheel brush addition | March | Committed | $15,000.00 | $31,996.60 | $-16,996.60 | Wash Quality | Equipment | | | Completed | EQ-0211-2026-1692 | Medium | 2026 | Yes | |
| Ryan Payne | 200 | 211 | Chain-rollers/rebuild | September | Committed | $13,500.00 | $0.00 | $0.00 | Prevent further damage | Equipment | Conveyor Chain | | Awaiting Approval | | High | 2026 | Yes | |
| David Carreon | 200 | 212 | Camera Sytem Upgrade/Replacement | N/A | Uncommitted | $3,000.00 | $0.00 | $0.00 | Planned maintenance | IT | Camera | Safety | Deferred | | Low | 2025 | No | |
| Rusty Modesty | 200 | 212 | Landscaping | N/A | Uncommitted | $8,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Prevent further damage | Deferred | | Low | 2025 | No | |
| Phil Loper | 200 | 212 | Tire Brush - Install tire Brush | October | Committed | $16,000.00 | $22,074.82 | $-6,074.82 | Planned maintenance | Equipment | Wheel Brush | Wash Quality | Completed | EQ-0212-2025-1511 | Low | 2025 | No | |
| Abel Smith | 200 | 212 | Vacuum - Double Drop Vacuum Hoses | November | Committed | $11,200.00 | $10,028.38 | $1,171.62 | Planned maintenance | Equipment | Vacuum | Customer Experience | Completed | EQ-0212-2025-1536 | Low | 2025 | No | |
| Mason Faltysek | 200 | 212 | Building improvements - Office wall water Damage. | May | Committed | $19,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Prevent further damage | Completed | FA-0212-2025-1316 | Low | 2025 | No | |
| Abel Smith | 200 | 212 | Relocation of overhead solenoids | N/A | Uncommitted | $0.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Building Facilities | Safety | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 200 | 212 | Paint - Repaint (existing paint peeling) | May | Committed | $11,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Prevent further damage | Completed | FA-0212-2025-1316 | Low | 2025 | No | |
| Mason Faltysek | 200 | 212 | Paint - Vacuum Stall Paint | May | Committed | $15,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Customer Experience | Completed | FA-0212-2025-1316 | Low | 2025 | No | |
| Mason Faltysek | 200 | 212 | Parking lot restripe | N/A | Uncommitted | $6,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Customer Experience | Deferred | | Low | 2025 | No | |
| Phil Loper | 200 | 212 | Conveyor Grates | N/A | Uncommitted | $19,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Conveyor Chain | Safety | Deferred | | Low | 2025 | No | |
| Ryan Payne | 200 | 212 | Equipment Wrap Brush Replacement | N/A | Uncommitted | $39,000.00 | $0.00 | $0.00 | Wash Quality | Equipment | | | Deferred | | High | 2026 | No | |
| Ryan Payne | 200 | 212 | Vac Enclosure Door--Change to Roll Up Door | September | Committed | $7,500.00 | $0.00 | $0.00 | Safety | Building/Site | Facilities Site Work | | Ordered | FA-0212-2026-1931 | Low | 2026 | No | |
| Ryan Payne | 200 | 212 | Flag Pole Repair | April | Committed | $6,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | Completed | FA-0212-2026-1725 | Low | 2026 | Yes | |
| Ryan Payne | 200 | 212 | Blowers | N/A | | $16,500.00 | $0.00 | $0.00 | Prevent further damage | Equipment | Blowers | | 2026 Request | | Medium | 2026 | No | |
| Ryan Payne | 200 | 212 | Power Pack | | Uncommitted | $15,000.00 | $0.00 | $0.00 | Customer Experience | Equipment | | | Deferred | | High | 2026 | No | |
| Ryan Payne | 200 | 212 | Water Leak in tower | June | Committed | $11,500.00 | $11,907.50 | $-407.50 | Prevent further damage | Building/Site | Facilities Site Work | | Completed | FA-0212-2026-1760 | High | 2026 | No | |
| Jonathan Blair | 200 | 212 | Grand Entry | October | Committed | $8,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Customer Experience | Awaiting Approval | | High | | No | |
| Rusty Modesty | 200 | 212 | Conveyor Replacement | September | Committed | $110,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Conveyor Chain | Prevent further damage | Proposal Solicitation | | High | | No | |
| Andrew Folse | 200 | 212 | New Conveyor | September | Committed | $100,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Conveyor Chain | Prevent further damage | Awaiting Approval | | High | | No | |
| Mason Faltysek | 200 | 213 | XPT 1 gate box balusters (middle XPT) | N/A | Uncommitted | $2,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | XPT | Prevent further damage | Deferred | | Low | 2025 | No | |
| Phil Loper | 200 | 213 | Install a tire brush | N/A | Uncommitted | $14,500.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Wheel Brush | Wash Quality | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 200 | 213 | Paint - Repaint (existing paint peeling) | May | Committed | $37,898.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Prevent further damage | Completed | FA-0213-2025-1318 | Low | 2025 | No | |
| Mason Faltysek | 200 | 213 | Parking lot restripe | N/A | Uncommitted | $6,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Customer Experience | Deferred | | Low | 2025 | No | |
| Phil Loper | 200 | 213 | Addition of Wheel Brush | October | Committed | $16,000.00 | $21,582.84 | $-5,582.84 | Planned maintenance | Equipment | Wheel Brush | Customer Experience | Completed | EQ-0213-2025-1510 | Low | 2025 | No | |
| Ryan Payne | 200 | 213 | Repaint awnings. | | Uncommitted | $15,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | | | Deferred | | High | 2026 | No | |
| Ryan Payne | 200 | 213 | Market Spare 40 Vac Producer | May | Committed | $18,600.00 | $17,397.94 | $1,202.06 | Prevent further damage | Equipment | Vacuum | | Completed | EQ-0213-2026-1720 | High | 2026 | Yes | |
| Ryan Payne | 200 | 213 | Conveyor Replacement | N/A | | $108,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | Conveyor Chain | | 2026 Request | | High | 2026 | No | |
| Ryan Payne | 200 | 213 | Wrap Replacement | N/A | Uncommitted | $39,000.00 | $0.00 | $0.00 | Wash Quality | Equipment | | | Deferred | | High | 2026 | Yes | |
| Ryan Payne | 200 | 213 | Water leak in tower, repaint office | August | Uncommitted | $15,500.00 | $0.00 | $0.00 | Prevent further damage | Building/Site | Facilities Site Work | | Deferred | | High | 2026 | No | |
| Ryan Payne | 200 | 213 | Canopy above vacuums needs to be fixed. | N/A | Uncommitted | $10,000.00 | $0.00 | $0.00 | Safety | Building/Site | Facilities Site Work | | Deferred | | Medium | 2026 | No | |
| Abel Smith | 200 | 214 | Conveyor Chain and rebuild. | June | Committed | $14,500.00 | $11,889.59 | $2,610.41 | Planned maintenance | Equipment | chain/roller | Wash Quality | Completed | EQ-0214-2025-1409 | Low | 2025 | No | |
| Mason Faltysek | 200 | 214 | Paint - Repaint (existing paint peeling) | N/A | Uncommitted | $25,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Prevent further damage | Deferred | | Low | 2025 | No | |
| Ryan Payne | 200 | 214 | Water Leak in tower | August | Committed | $10,000.00 | $0.00 | $0.00 | Prevent further damage | Building/Site | Facilities Site Work | | Deferred | | High | 2026 | No | |
| Ryan Payne | 200 | 214 | Tunnel Colored lighting | | | $8,000.00 | $0.00 | $0.00 | Customer Experience | Equipment | Building Facilities | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 200 | 214 | Roof and building painting | May | Committed | $81,000.00 | $71,387.27 | $9,612.73 | Customer Experience | Building/Site | Facilities Site Work | | Completed | FA-0214-2026-1766 | Medium | 2026 | Yes | |
| Ryan Payne | 200 | 214 | Tar clean up off exterior walls | June | Committed | $25,000.00 | $71,387.27 | $-46,387.27 | Safety | Building/Site | | | Deferred | FA-0214-2026-1766 | Low | 2026 | Yes | |
| Ryan Payne | 200 | 214 | Repaint awnings | May | Committed | $15,000.00 | $16,237.50 | $-1,237.50 | Customer Experience | Building/Site | | | Completed | FA-0214-2026-1765 | Medium | 2026 | Yes | |
| Ryan Payne | 200 | 214 | Matt Machine Jko Mat Machine | | | $6,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | 2026 Request | | Medium | 2026 | No | |
| Ryan Payne | 200 | 215 | Power Packs Replacement | | Uncommitted | $30,000.00 | $0.00 | $0.00 | Wash Quality | Equipment | | | Deferred | | High | 2026 | No | |
| Ryan Payne | 200 | 215 | Repair or replace the wet mat cleaning machine | | | $10,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Mason Faltysek | 200 | 216 | Windows perm solution for ventalation | June | Committed | $19,000.00 | $27,062.50 | $-8,062.50 | Planned maintenance | Building/Site | Building Facilities | Safety | Completed | FA-0216-2025-1319 | Low | 2025 | No | |
| Abel Smith | 200 | 216 | Air Compressor | October | Committed | $7,000.00 | $8,845.42 | $-1,845.42 | Planned maintenance | Equipment | Compressors Replacement | Wash Quality | Completed | EQ-0216-2025-1469 | Low | 2025 | No | |
| Rusty Modesty | 200 | 216 | Building improvements - Office Entry Doors not closing and bent | N/A | Uncommitted | $3,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Prevent further damage | Deferred | | Low | 2025 | No | |
| Rusty Modesty | 200 | 216 | Landscaiping: mulch beds, add plants to parking lot bed, trim trees and roses | May | Committed | $7,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Prevent further damage | Completed | | Low | 2025 | No | |
| Phil Loper | 200 | 216 | tire brushes | N/A | Uncommitted | $4,500.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Wheel Brush | Wash Quality | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 200 | 216 | Lighting - Addition of lighting in parking area | N/A | Uncommitted | $15,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Safety | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 200 | 216 | Paint - Repaint (existing paint peeling) | June | Committed | $9,288.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Prevent further damage | Completed | | Low | 2025 | No | |
| Mason Faltysek | 200 | 216 | Parking lot restripe | N/A | Uncommitted | $6,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Customer Experience | Deferred | | Low | 2025 | No | |
| Abel Smith | 200 | 216 | Top sprayer | N/A | Uncommitted | $3,800.00 | $0.00 | $0.00 | Planned maintenance | Equipment | high pressure rinse | Wash Quality | Deferred | | Low | 2025 | No | |
| Ryan Payne | 200 | 216 | Wall Panneling (DS blower room) | | | $15,500.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 200 | 216 | Landscaping: mulch beds & add shore up crushed granite beds | June | Committed | $15,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | Completed | FA-0216-2026-1833 | Low | 2026 | No | |
| Ryan Payne | 200 | 216 | Touch up brown paint peelig in lot on canopies | | Uncommitted | $12,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | | | Deferred | | High | 2026 | No | |
| Ryan Payne | 200 | 216 | x2 Car Wash Entrance signs - yellowing & need to be replaced | June | Committed | $16,000.00 | $4,916.99 | $11,083.01 | Customer Experience | Building/Site | Building Facilities | | Completed | SI-0216-2026-1795 | Low | 2026 | No | |
| Ryan Payne | 200 | 216 | Tire Brush Install | March | Committed | $15,000.00 | $32,284.09 | $-17,284.09 | Wash Quality | Equipment | | | Completed | EQ-0216-2026-1693 | Medium | 2026 | Yes | |
| Ryan Payne | 200 | 216 | top omni | N/A | | $15,000.00 | $0.00 | $0.00 | Wash Quality | Equipment | | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 200 | 216 | Mezzanine ladder guard | N/A | | $6,000.00 | $0.00 | $0.00 | Safety | Building/Site | Facilities Site Work | | 2026 Request | | High | 2026 | No | |
| Andrew Folse | 100 | 216 | Water Softener | July | Uncommitted | $4,500.00 | $0.00 | $0.00 | Planned maintenance | Equipment | | Wash Quality | Deferred | | Low | | No | |
| Andrew Folse | 200 | 216 | Water Softener | August | Committed | $4,500.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Water Softener | Wash Quality | Awaiting Approval | EQ-0216-2026-1922 | Low | | No | |
| Rusty Modesty | 200 | 217 | Landscaping: mulch beds, new plants in lot flower beds, plant missing trees | N/A | Uncommitted | $7,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Prevent further damage | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 200 | 217 | Parking lot restripe | N/A | Uncommitted | $6,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Customer Experience | Deferred | | Low | 2025 | No | |
| Ryan Payne | 200 | 217 | Wall Panneling | October | Committed | $16,500.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 200 | 217 | Landscaping: mulch beds, new plants in drive flower beds, trim trees | June | Committed | $15,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | Completed | FA-0217-2026-1834 | Low | 2026 | No | |
| Mason Faltysek | 200 | 219 | Roof leak repair (Active project?) | N/A | Uncommitted | $16,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Prevent further damage | Deferred | | Low | 2025 | No | |
| Rusty Modesty | 200 | 219 | Landscaping | N/A | Uncommitted | $8,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Prevent further damage | Deferred | | Low | 2025 | No | |
| Mason faltysek | 200 | 219 | Exit Pad Concrete | N/A | Uncommitted | $15,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Customer Experience | Deferred | | Low | 2025 | No | |
| Ryan Payne | 200 | 219 | French Drain XPT2 | | | $30,000.00 | $0.00 | $0.00 | Safety | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 200 | 219 | Landscaping refresh | June | Committed | $15,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | Completed | FA-0219-2026-1835 | Low | 2026 | No | |
| Rusty Modesty | 200 | 219 | Chain/Roller Rebuild | June | Committed | $14,500.00 | $14,402.26 | $97.74 | Planned maintenance | Equipment | chain/roller | Customer Experience | Completed | EQ-0219-2026-1823 | High | | No | |
| Mason Faltysek | 200 | 220 | Cut Concrete channel for drainage in tunnel | August | Committed | $7,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Prevent further damage | Completed | | Low | 2025 | No | |
| David Carreon | 200 | 220 | Module screen for all gates | March | Committed | $5,600.00 | $3,736.83 | $1,863.17 | Planned maintenance | IT | XPT Gate | Customer Experience | Completed | EQ-0220-2025-1249 | Low | 2025 | No | |
| Ryan Payne | 200 | 220 | Landscaping--river rock from mulch | N/A | | $15,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Mason faltysek | 200 | 221 | Lighting in Tunnel | May | Uncommitted | $8,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Safety | Completed | | Low | 2025 | No | |
| Mason Faltysek | 200 | 221 | Exterior lighting | N/A | Uncommitted | $7,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Safety | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 200 | 221 | Signage - New Grand Entry Arch (top and sides) | N/A | Uncommitted | $13,500.00 | $0.00 | $0.00 | Planned maintenance | Equipment | marketing/signage | Customer Experience | Deferred | | Low | 2025 | No | |
| Abel Smith | 200 | 221 | Vac Tool Coversion | N/A | Uncommitted | $11,200.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Vacuum | Customer Experience | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 200 | 221 | Lighting in tunnel | September | Committed | $8,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Safety | Completed | | Low | 2025 | No | |
| Mason Faltysek | 200 | 221 | Parking lot restripe | N/A | Uncommitted | $6,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Customer Experience | Deferred | | Low | 2025 | No | |
| Ryan Payne | 200 | 221 | Building Equipment room exhaust fan | June | Committed | $10,500.00 | $9,959.00 | $541.00 | Safety | Building/Site | Facilities Site Work | | Completed | FA-0221-2026-1837 | Low | 2026 | No | |
| Ryan Payne | 200 | 221 | Concrete Exit Pad | | | $10,000.00 | $0.00 | $0.00 | Safety | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 200 | 221 | Grand Entry Arch | October | Committed | $8,000.00 | $0.00 | $0.00 | Customer Experience | Equipment | Building Facilities | | 2026 Request | | Low | 2026 | Yes | |
| Ryan Payne | 200 | 221 | Vac Tool Conversion | | | $10,000.00 | $0.00 | $0.00 | | Equipment | Vacuum | | 2026 Request | | Medium | 2026 | No | |
| Ryan Payne | 200 | 224 | Relocate Mat Machines | N/A | | $10,000.00 | $0.00 | $0.00 | | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 200 | 224 | XPT Sign replaced | | | $8,000.00 | $0.00 | $0.00 | Customer Experience | Equipment | Building Facilities | | 2026 Request | | High | 2026 | No | |
| Abel Smith | 300 | 301 | Hydra Flex - New Hydra Flex | September | Committed | $6,500.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Hydroflex | Wash Quality | Completed | EQ-0301-2025-1577 | Low | 2025 | No | |
| Abel Smith | 300 | 301 | Prep Guns | N/A | Uncommitted | $11,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Prep Pump | Wash Quality | Deferred | | Medium | 2025 | No | |
| Mason Faltysek | 300 | 301 | Drainage in Lot (Entrance) (Talk with Lauren before schedule) | N/A | Uncommitted | $5,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Prevent further damage | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 300 | 301 | Parking lot restripe | N/A | Uncommitted | $6,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Customer Experience | Deferred | | Low | 2025 | No | |
| Abel Smith | 300 | 301 | Exit Conveyor Section | N/A | Uncommitted | $10,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Conveyor Chain | Customer Experience | Deferred | | Low | 2025 | No | |
| Lauren Fine | 300 | 301 | TCS1 Upgrade | | | $45,000.00 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | 2026 Request | | Low | 2026 | No | |
| Jonathan Blair | 100 | 301 | Canopies over vacuum | August | Committed | $0.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | | | Ordered | FA-0301-2026-1894 | High | | No | |
| Abel Smith | 300 | 302 | Blower Project | March | Committed | $15,000.00 | $57,740.73 | $-42,740.73 | Planned maintenance | Equipment | Blowers | Wash Quality | Completed | EQ-0302-2025-1200 | Low | 2025 | No | |
| Abel Smith | 300 | 302 | Conveyor rebuild | N/A | Uncommitted | $7,500.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Conveyor Chain | Wash Quality | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 300 | 302 | Parking lot restripe | N/A | Uncommitted | $6,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Customer Experience | Deferred | | Low | 2025 | No | |
| Abel Smith | 300 | 302 | Wind Door Installation - Entrance | N/A | Uncommitted | $12,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Safety | Deferred | | Low | 2025 | No | |
| Ryan Payne | 300 | 302 | Tunnel radiant heater | January | Committed | $19,300.00 | $19,419.35 | $-119.35 | Safety | Building/Site | Facilities Site Work | Safety | Completed | FA-0302-2026-1642 | High | 2026 | Yes | |
| Lauren Fine | 300 | 302 | TCS1 Upgrade | | | $45,000.00 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | 2026 Request | | Low | 2026 | No | |
| Abel Smith | 300 | 303 | Chain and rollers | August | Committed | $12,000.00 | $14,010.87 | $-2,010.87 | Planned maintenance | Equipment | chain/roller | Wash Quality | Completed | EQ-0303-2025-1516 | Low | 2025 | No | |
| David Carreon | 300 | 303 | Alarm System | N/A | Uncommitted | $3,200.00 | $0.00 | $0.00 | Planned maintenance | IT | Technology | Safety | Deferred | | Low | 2025 | No | |
| Abel Smith | 300 | 303 | Conveyor/tunnel Grates | September | Committed | $9,000.00 | $8,700.00 | $300.00 | Planned maintenance | Equipment | Conveyor Chain | Wash Quality | Completed | EQ-0303-2025-1424 | Low | 2025 | No | |
| David Carreon | 300 | 303 | Exit Gate | May | Committed | $7,500.00 | $11,660.61 | $-4,160.61 | Planned maintenance | IT | XPT | Safety | Completed | EQ-0303-2025-1336 | Low | 2025 | No | |
| Mason faltysek | 300 | 303 | Lighting - Addition of lights in parking area | June | Committed | $15,000.00 | $10,282.30 | $4,717.70 | Planned maintenance | Building/Site | Facilities Site Work | Safety | Completed | FA-0303-2025-1348 | Low | 2025 | No | |
| Mason Faltysek | 300 | 303 | Paint - Roof Paint | June | Committed | $33,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Prevent further damage | Completed | FA-0303-2023-416 | Low | 2025 | No | |
| Abel Smith | 300 | 303 | Parking lot restripe | N/A | Uncommitted | $6,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Customer Experience | Deferred | | Low | 2025 | No | |
| Mason faltysek | 300 | 303 | Repaving Lot | June | Committed | $35,000.00 | $40,000.00 | $-5,000.00 | Planned maintenance | Building/Site | Facilities Site Work | Prevent further damage | Completed | FA-0303-2025-1347 | Low | 2025 | No | |
| Abel Smith | 400 | 401 | Additional Flash Blower | Feb | Committed | $15,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Blowers | Wash Quality | Completed | | Low | 2025 | No | |
| Abel Smith | 400 | 401 | Ladder Rack for Tunnel and ER 80ft | N/A | Uncommitted | $3,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Building Facilities | Safety | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 400 | 401 | Replace pylon sign faces | March | Committed | $5,600.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | marketing/signage | Customer Experience | Completed | | Low | 2025 | No | |
| Ryan Payne | 400 | 401 | rockers to replace van highs | | | $15,500.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 400 | 401 | 401-CAPEX Chain/Roller Refit | January | Committed | $13,500.00 | $15,038.03 | $-1,538.03 | Prevent further damage | Equipment | Conveyor Chain | Prevent further damage | Completed | EQ-0401-2026-1624 | Low | 2026 | No | |
| Ryan Payne | 400 | 401 | Power Pack to seperate Single PP | | Uncommitted | $15,000.00 | $0.00 | $0.00 | Customer Experience | Equipment | | | Deferred | | High | 2026 | No | |
| Ryan Payne | 400 | 401 | Office remodel (Flooring, Paint, Customer Island, Break room in place of extra bathroom? Lobby becomes manager office.) | | | $25,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 400 | 401 | Tunnel liners (Exit area) Use of extra Material? | April | Committed | $18,500.00 | $26,927.70 | $-8,427.70 | Customer Experience | Building/Site | Facilities Site Work | | Completed | FA-0401-2026-1726 | Low | 2026 | Yes | |
| Ryan Payne | 400 | 401 | Second mat cleaner machine (Dry JKo | | | $6,500.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 400 | 401 | Whitewater Arch (Complete Arch) | October | Committed | $8,000.00 | $0.00 | $0.00 | Customer Experience | Equipment | Building Facilities | | 2026 Request | | Low | 2026 | Yes | |
| Ryan Payne | 400 | 401 | Take windows out and put roll up doors/ or add vents in tunnel area | June | Committed | $8,200.00 | $8,118.75 | $81.25 | Safety | Building/Site | Facilities Site Work | | Completed | FA-0401-2026-1811 | Medium | 2026 | Yes | |
| Andrew Folse | 400 | 401 | Smart Water Meter | August | Committed | $4,485.62 | $3,860.62 | $625.00 | Planned maintenance | Building/Site | | Safety | In-Process | EQ-0401-2026-1918 | Low | | No | |
| Phil Loper | 400 | 402 | Aqua Lab new | Mar | Committed | $4,500.00 | $8,779.41 | $-4,279.41 | Planned maintenance | Equipment | Hydroflex | Wash Quality | Completed | EQ-0402-2025-1212 | Low | 2025 | No | |
| David Carreon | 400 | 402 | XPT Printers | N/A | Uncommitted | $3,850.00 | $0.00 | $0.00 | Planned maintenance | IT | XPT | Customer Experience | Deferred | | Low | 2025 | No | |
| David Carreon | 400 | 402 | XPT Receipt Printers - 2x | Non Capex | Uncommitted | $2,800.00 | $0.00 | $0.00 | Planned maintenance | IT | XPT | Customer Experience | Deferred | | Low | 2025 | No | |
| Phil Loper | 400 | 402 | Tire brush - Poodle Brushs | N/A | Uncommitted | $4,800.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Wheel Brush | Wash Quality | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 400 | 402 | Parking lot restripe | N/A | Uncommitted | $6,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Customer Experience | Deferred | | Low | 2025 | No | |
| Ryan Payne | 400 | 402 | Dumpster Enclosure | January | Committed | $12,000.00 | $0.00 | $0.00 | Safety | Building/Site | Facilities Site Work | | Completed | FA-0402-2026-1640 | High | 2026 | Yes | |
| Ryan Payne | 400 | 402 | Matt Machine Jko Mat Machine | | | $6,500.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 400 | 402 | Conveyor Chain/Rollers | January | Committed | $15,507.00 | $14,736.49 | $770.51 | Prevent further damage | Equipment | Conveyor Chain | Prevent further damage | Completed | EQ-0402-2026-1625 | Low | 2026 | No | |
| Ryan Payne | 400 | 402 | Landscaping Refresh | June | Committed | $15,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | Deferred | | Low | 2026 | No | |
| Ryan Payne | 400 | 402 | Sign Clearance Signs for Drive | | | $7,500.00 | $0.00 | $0.00 | Customer Experience | Equipment | Building Facilities | | 2026 Request | | Medium | 2026 | No | |
| Andrew Folse | 400 | 402 | Tunnel wall liners | November | Uncommitted | $16,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Customer Experience | Uncommitted | | Low | | No | |
| David Carreon | 400 | 403 | Gate Control Modules 2x | N/A | Uncommitted | $2,800.00 | $0.00 | $0.00 | Planned maintenance | IT | XPT | Customer Experience | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 400 | 403 | Tunnel Liner Wall Panels | October | Committed | $15,500.00 | $17,181.27 | $-1,681.27 | Planned maintenance | Building/Site | Building Facilities | Customer Experience | Completed | FA-0403-2025-1514 | Low | 2025 | No | |
| Rusty Modesty | 400 | 403 | City Water Booster Pump | N/A | Uncommitted | $0.00 | $0.00 | $0.00 | Planned maintenance | Equipment | high pressure pump | Wash Quality | Awaiting Approval | | Medium | | No | |
| Abel Smith | 400 | 404 | Chain - New Chain,rollers, drum and sprocket | N/A | Uncommitted | $13,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | chain/roller | Wash Quality | Deferred | | Low | 2025 | No | |
| Abel Smith | 400 | 404 | Tire brush - New Bison Brush for Second Set | N/A | Uncommitted | $4,500.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Wheel Brush | Wash Quality | Deferred | | Low | 2025 | No | |
| Ryan Payne | 400 | 404 | Create exit lane from exit of tunnel onto Yager Ln | | | $100,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 400 | 404 | Tunnel Liners Entire Tunnel | April | Committed | $18,500.00 | $15,857.76 | $2,642.24 | Customer Experience | Building/Site | Facilities Site Work | | Completed | FA-0404-2026-1727 | Low | 2026 | Yes | |
| Ryan Payne | 400 | 404 | Matt Machine Jko Mat Machine | | | $5,521.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Abel Smith | 400 | 405 | Pump - Higher pressure pump for pressure guns | September | Committed | $5,000.00 | $5,345.34 | $-345.34 | Planned maintenance | Equipment | high pressure pump | Wash Quality | Completed | EQ-0405-2025-1439 | Low | 2025 | No | |
| Abel Smith | 400 | 405 | Wrap Core & Material (DS) | N/A | Uncommitted | $4,600.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Wrap Brush | Wash Quality | Deferred | | Low | 2025 | No | |
| Abel Smith | 400 | 405 | Groundfus Pumps | N/A | Uncommitted | $14,500.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Hydroflex | Wash Quality | Deferred | | Low | 2025 | No | |
| Abel Smith | 400 | 405 | Blower - Add Flash Blower | August | Committed | $3,500.00 | $4,259.30 | $-759.30 | Planned maintenance | Equipment | Blowers | Wash Quality | Completed | EQ-0405-2025-1440 | Low | 2025 | No | |
| Ryan Payne | 400 | 405 | Conveyor Chain/Rollers | | Uncommitted | $13,500.00 | $0.00 | $0.00 | Prevent further damage | Equipment | Conveyor Chain | | Deferred | | High | 2026 | No | |
| Ryan Payne | 400 | 405 | 20 GPM Grundfos Hydraflex Pump | May | Committed | $9,000.00 | $273.90 | $8,726.10 | Wash Quality | Equipment | | | Completed | EQ-0405-2026-1798 | Medium | 2026 | Yes | |
| Ryan Payne | 400 | 405 | Upgrade Whitewater Arch (Complete Arch) | October | Committed | $8,000.00 | $0.00 | $0.00 | Customer Experience | Equipment | Building Facilities | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 400 | 405 | Vac Double Vacuum stall count with shade East side of current vac lane | | | $50,000.00 | $0.00 | $0.00 | Customer Experience | Equipment | Vacuum | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 400 | 406 | Tunnel Liners Entire Tunnel | April | Committed | $18,500.00 | $17,502.23 | $997.77 | Customer Experience | Building/Site | Facilities Site Work | | Completed | FA-0406-2026-1728 | Low | 2026 | No | |
| Abel Smith | 400 | 407 | Prep Guns | April | Committed | $11,000.00 | $17,355.35 | $-6,355.35 | Planned maintenance | Equipment | Prep Pump | Wash Quality | Completed | EQ-0407-2025-1238 | Low | 2025 | No | |
| Phil Loper | 400 | 407 | Replace grill Brush with 24in Rockers | November | Committed | $13,976.66 | $12,265.10 | $1,711.56 | Planned maintenance | Equipment | Wrap Brush | Wash Quality | Completed | EQ-0407-2025-1525 | Low | 2025 | No | |
| David Carreon | 400 | 407 | Camera - Inspection Camera Arch Install | July | Committed | $3,000.00 | $7,264.51 | $-4,264.51 | Planned maintenance | IT | Camera | Safety | Completed | EQ-0407-2025-1401 | Low | 2025 | No | |
| Mason Faltysek | 400 | 407 | Lighting - Tower Lights | N/A | Uncommitted | $9,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Safety | Deferred | | Low | 2025 | No | |
| Abel Smith | 400 | 407 | Addition of Rocker Brush | N/A | Uncommitted | $13,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Wrap Brush | Customer Experience | Deferred | | Low | 2025 | No | |
| Ryan Payne | 400 | 407 | Belt Replace | May | Committed | $50,000.00 | $49,119.65 | $880.35 | Customer Experience | Equipment | Conveyor Belt | | Completed | EQ-0407-2026-1750 | Medium | 2026 | Yes | |
| Ryan Payne | 400 | 407 | Replacing Mizer with Aqualab (2) Aqua Lab 3 Panels | | Uncommitted | $20,000.00 | $0.00 | $0.00 | Wash Quality | Equipment | | | Deferred | | High | 2026 | Yes | |
| Ryan Payne | 400 | 407 | Compressor Install 1 additional | February | Committed | $6,500.00 | $5,668.38 | $831.62 | Wash Quality | Equipment | Compressors Replacement | | Completed | EQ-0407-2026-1650 | Medium | 2026 | No | |
| Ryan Payne | 400 | 407 | Recaulk Facility (Foundation) | May | Committed | $3,500.00 | $0.00 | $0.00 | Prevent further damage | Building/Site | Facilities Site Work | | Completed | FA-0407-2026-1784 | Low | 2026 | No | |
| Ryan Payne | 400 | 407 | Tower Lights at Exit of Tunnel | | Uncommitted | $10,000.00 | $0.00 | $0.00 | Customer Experience | Equipment | Building Facilities | | Deferred | | High | 2026 | No | |
| Andrew Folse | 400 | 407 | Grand Entry Arch | October | Committed | $8,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | marketing/signage | | Awaiting Approval | | Low | | No | |
| Abel Smith | 400 | 408 | Prep Gun | May | Committed | $11,000.00 | $17,191.24 | $-6,191.24 | Planned maintenance | Equipment | Prep Pump | Wash Quality | Completed | EQ-0408-2025-1239 | Low | 2025 | No | |
| Mason Faltysek | 400 | 408 | Lighting - Tower Lights | N/A | Uncommitted | $9,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Safety | Deferred | | Low | 2025 | No | |
| Brandy Fruia | 400 | 408 | Canopy | September | Committed | $18,000.00 | $17,990.07 | $9.93 | Planned maintenance | Building/Site | Building Facilities | Customer Experience | Completed | FA-0408-2025-1456 | Low | 2025 | No | |
| Ryan Payne | 400 | 408 | Equipment Mitters & Small Rocker for beginning of tunnel | | | $35,000.00 | $0.00 | $0.00 | Wash Quality | Equipment | | | 2026 Request | | Medium | 2026 | No | |
| Ryan Payne | 400 | 408 | Roof Replacement | April | Committed | $28,000.00 | $27,062.50 | $937.50 | Prevent further damage | Building/Site | Facilities Site Work | | Completed | FA-0408-2026-1732 | Medium | 2026 | Yes | |
| Ryan Payne | 400 | 408 | Replacing Mizer with Aqualab (2) Aqua Lab 3 Panels | | Uncommitted | $20,000.00 | $0.00 | $0.00 | Wash Quality | Equipment | | | Deferred | | High | 2026 | Yes | |
| Ryan Payne | 400 | 408 | Compressor Install 1 additional | August | Committed | $4,000.00 | $0.00 | $0.00 | Wash Quality | Equipment | Compressors Replacement | | In-Process | EQ-0408-2026-1921 | Medium | 2026 | No | |
| Ryan Payne | 400 | 408 | Canopy over Stand Alone Vacs | May | Uncommitted | $33,500.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | Deferred | | Low | 2026 | No | |
| Ryan Payne | 400 | 408 | Tower Lights at Exit of Tunnel | | Uncommitted | $10,000.00 | $0.00 | $0.00 | Customer Experience | Equipment | Building Facilities | | Deferred | | High | 2026 | No | |
| Abel Smith | 400 | 409 | Prep Gun | N/A | Committed | $11,000.00 | $15,085.82 | $-4,085.82 | Planned maintenance | Equipment | Prep Pump | Wash Quality | Completed | EQ-0409-2025-1240 | Low | 2025 | No | |
| Phil Loper | 400 | 409 | Signage - Entrance Arch Right Side | N/A | Uncommitted | $3,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | marketing/signage | Customer Experience | Deferred | | Low | 2025 | No | |
| Abel Smith | 400 | 409 | Wear Plates | October | Committed | $25,000.00 | $38,368.37 | $-13,368.37 | Planned maintenance | Equipment | Conveyor Belt | Wash Quality | Completed | EQ-0409-2025-1512 | Low | 2025 | No | |
| Mason Faltysek | 400 | 409 | Parking lot restripe | N/A | Uncommitted | $6,500.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Facilities Site Work | Customer Experience | Deferred | | Low | 2025 | No | |
| Mason faltysek | 400 | 409 | Replacement Light Fixtures (Interior) | N/A | Uncommitted | $4,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Customer Experience | Deferred | | Low | 2025 | No | |
| Mason faltysek | 400 | 409 | Replacement Light Fixtures (Interior) | October | Committed | $4,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Technology | Customer Experience | Completed | | Low | 2025 | No | |
| Ryan Payne | 400 | 409 | Equipment Mitters & Small Rocker for beginning of tunnel | | | $35,000.00 | $0.00 | $0.00 | Wash Quality | Equipment | | | 2026 Request | | Medium | 2026 | Yes | |
| Ryan Payne | 400 | 409 | Replacing Mizer with Aqualab (2) Aqua Lab 3 Panels | | Uncommitted | $20,000.00 | $0.00 | $0.00 | Wash Quality | Equipment | | | Deferred | | High | 2026 | Yes | |
| Ryan Payne | 400 | 409 | Swap camera system to VAST | | | $2,500.00 | $0.00 | $0.00 | Safety | IT | Camera | | 2026 Request | | Low | 2026 | No | |
| Abel Smith | 400 | 410 | Prep Guns | April | Committed | $11,000.00 | $14,776.76 | $-3,776.76 | Planned maintenance | Equipment | Prep Pump | Wash Quality | Completed | EQ-0410-2025-1241 | Low | 2025 | No | |
| Abel Smith | 400 | 410 | Wear Plates | June | Committed | $32,000.00 | $21,569.04 | $10,430.96 | Planned maintenance | Equipment | Conveyor Belt | Wash Quality | Completed | EQ-0410-2025-1337 | Low | 2025 | No | |
| Mason Faltysek | 400 | 410 | Parking lot restripe | N/A | Uncommitted | $6,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Customer Experience | Deferred | | Low | 2025 | No | |
| Phil Loper | 400 | 410 | Aqua - LabAdd 2nd Aqua lab | N/A | Uncommitted | $6,200.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Hydroflex | Wash Quality | Deferred | | Low | 2025 | No | |
| Ryan Payne | 400 | 410 | Aqualab instead of Dosatrons (1) Aqualab 3 Panel | | | $15,000.00 | $0.00 | $0.00 | Wash Quality | Equipment | | | 2026 Request | | Medium | 2026 | Yes | |
| Ryan Payne | 400 | 410 | Cameras | March | Committed | $5,500.00 | $0.00 | $0.00 | Wash Quality | IT | Camera | | Completed | EQ-0410-2026-1685 | Medium | 2026 | No | |
| Ryan Payne | 400 | 412 | spare compressor region | April | Committed | $6,500.00 | $6,157.28 | $342.72 | Prevent further damage | Equipment | Compressors Replacement | | Completed | EQ-0412-2026-1686 | High | 2026 | Yes | |
| Ryan Payne | 400 | 412 | DRB conversion (TCS Conversion) | | | $46,000.00 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | 2026 Request | | Low | 2026 | No | |
| Ryan Payne | 400 | 412 | Repaint Red vacuum booms | | | $15,000.00 | $0.00 | $0.00 | Customer Experience | Equipment | | | 2026 Request | | Low | 2026 | No | |
| Andrew Folse | 400 | 412 | Water Softener | August | Committed | $4,500.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Water Softener | Wash Quality | In-Process | EQ-0412-2026-1923 | Low | | No | |
| Rusty Modesty | 400 | 414 | Chain/Roller Rebuild | November | Committed | $0.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Conveyor Chain | Customer Experience | Awaiting Approval | | High | | No | |
| Gary Kingsbury | 500 | 501 | Exit gate - for Vacuum Area | N/A | Uncommitted | $6,500.00 | $0.00 | $0.00 | Planned maintenance | Equipment | XPT | Safety | Deferred | | Low | 2025 | No | |
| Lauren Fine | 500 | 501 | Seal and restripe lot | | | $7,500.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Building Facilities | | Deferred | | Low | 2026 | No | |
| Lauren Fine | 500 | 502 | Replacement Compressor Pump | May | Committed | $8,500.00 | $2,902.07 | $5,597.93 | Prevent further damage | Equipment | Compressors Replacement | Prevent further damage | Completed | EQ-0502-2026-1748 | Medium | 2026 | Yes | |
| Lauren Fine | 500 | 502 | Drainage at exit | October | Committed | $10,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Lauren Fine | 500 | 502 | Seal and restripe lot | | | $7,500.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Building Facilities | | Deferred | | Low | 2026 | No | |
| Lauren Fine | 500 | 502 | Replace tunnel heater | January | | $12,000.00 | $0.00 | $0.00 | Prevent further damage | Building/Site | Facilities Site Work | | Deferred | | High | 2026 | No | |
| Mason Faltysek | 500 | 503 | Parking lot restripe | N/A | Uncommitted | $6,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Customer Experience | Deferred | | Low | 2025 | No | |
| Gary Kingsbury | 500 | 504 | Chain and rollers | N/A | Uncommitted | $12,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | chain/roller | Wash Quality | Deferred | | Low | 2025 | No | |
| Gary Kingsbury | 500 | 504 | Garage door system | N/A | Uncommitted | $14,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Safety | Deferred | | Low | 2025 | No | |
| Lauren Fine | 500 | 504 | SAL lane | August | Committed | $8,000.00 | $0.00 | $0.00 | Customer Experience | IT | Technology | Customer Experience | Awaiting Approval | | Low | 2026 | No | |
| Lauren Fine | 500 | 504 | Seal and restripe lot | | | $7,500.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Building Facilities | | Deferred | | Low | 2026 | No | |
| Gary Kingsbury | 500 | 504 | Garage Door | October | Committed | $15,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Building Facilities | Safety | Proposal Solicitation | | High | | No | |
| Lauren Fine | 500 | 505 | SAL lane | August | Committed | $8,000.00 | $0.00 | $0.00 | Customer Experience | IT | Technology | Customer Experience | Proposal Solicitation | | Low | 2026 | No | |
| Lauren Fine | 500 | 505 | Seal and restripe lot | | | $7,500.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Building Facilities | | Deferred | | Low | 2026 | No | |
| Gary Kingsbury | 500 | 506 | Canopy above XPT | May | Committed | $7,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | XPT | Customer Experience | Completed | EQ-506-2025-1330 | Low | 2025 | No | |
| Mason Faltysek | 500 | 506 | Concrete at Tunnel Exit and metal Exit Plate | October | Committed | $9,500.00 | $6,520.39 | $2,979.61 | Planned maintenance | Building/Site | Facilities Site Work | Prevent further damage | Completed | FA-0506-2025-1528 | Low | 2025 | No | |
| Lauren Fine | 500 | 506 | Chain and rollers | June | Committed | $15,500.00 | $12,401.50 | $3,098.50 | Prevent further damage | Equipment | Conveyor Chain | Prevent further damage | Completed | EQ-0506-2026-1820 | High | 2026 | Yes | |
| Gary Kingsbury | 500 | 507 | Canopy above SAL lane | May | Committed | $7,500.00 | $8,694.57 | $-1,194.57 | Planned maintenance | Building/Site | XPT | Customer Experience | Completed | EQ-0507-2025-1331 | Low | 2025 | No | |
| Lauren Fine | 500 | 507 | Chain and Roller Conveyor Rebuild | January | Committed | $13,500.00 | $13,582.51 | $-82.51 | Prevent further damage | Equipment | Conveyor Chain | | Completed | EQ-0507-2026-1620 | High | 2026 | No | |
| Lauren Fine | 500 | 507 | Building painting | June | | $24,500.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Building Facilities | | Deferred | | Medium | 2026 | No | |
| David Carreon | 500 | 508 | Cameras in the tunnel and in the parking lot | N/A | Uncommitted | $6,500.00 | $0.00 | $0.00 | Planned maintenance | IT | Camera | Safety | Deferred | | Low | 2025 | No | |
| Gary Kingsbury | 500 | 508 | Canopy above SAL lane | May | Committed | $7,500.00 | $9,087.53 | $-1,587.53 | Planned maintenance | Building/Site | XPT | Customer Experience | Completed | EQ-0508-2025-1332 | Low | 2025 | No | |
| Mason Faltysek | 500 | 508 | HVAC - Ventilation for the tunnel | June | Committed | $16,000.00 | $15,005.00 | $995.00 | Planned maintenance | Building/Site | Building Facilities | Safety | Completed | FA-0508-2025-1398 | Low | 2025 | No | |
| Gary Kingsbury | 500 | 508 | Increase size of vac producer | N/A | Uncommitted | $20,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Vacuum | Customer Experience | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 500 | 508 | Signage - Entrance signage | N/A | Uncommitted | $14,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | marketing/signage | Customer Experience | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 500 | 508 | Signage - Grand Entry Arch | N/A | Uncommitted | $14,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | marketing/signage | Customer Experience | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 500 | 508 | Building improvement - Close off area in Exit of Wash Bay | August | Committed | $5,500.00 | $6,318.00 | $-818.00 | Planned maintenance | Building/Site | Building Facilities | Prevent further damage | Completed | FA-0508-2025-1444 | Low | 2025 | No | |
| Gary Kingsbury | 500 | 508 | Chain | December | Uncommitted | $12,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | chain/roller | Wash Quality | Deferred | | Low | 2025 | No | |
| Mason faltysek | 500 | 508 | Tunnel Heater / Gas Conversion | November | Uncommitted | $8,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Safety | Deferred | | Low | 2025 | No | |
| Lauren Fine | 500 | 508 | Additional Air compressor | June | Committed | $8,500.00 | $9,628.61 | $-1,128.61 | Customer Experience | Equipment | Compressors Replacement | | Completed | EQ-0508-2026-1822 | Medium | 2026 | Yes | |
| Lauren Fine | 500 | 508 | Boiler/Heat | January | Committed | $20,000.00 | $34,646.35 | $-14,646.35 | Safety | Equipment | | Safety | Completed | EQ-0508-2026-1658 | High | 2026 | No | |
| Lauren Fine | 500 | 508 | Rhino Mat Cleaner Repair/Replace | July | Uncommitted | $6,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | Deferred | | Low | 2026 | No | |
| Lauren Fine | 500 | 508 | Vacuum upgrade | May | | $25,000.00 | $0.00 | $0.00 | Customer Experience | Equipment | Vacuum | | Deferred | | Low | 2026 | No | |
| Lauren Fine | 500 | 508 | Chain and Roller Conveyor Rebuild | December | Committed | $15,500.00 | $0.00 | $0.00 | Prevent further damage | Equipment | Conveyor Chain | Customer Experience | In-Process | | High | 2026 | Yes | |
| Lauren Fine | 500 | 509 | Chain and Roller Conveyor Rebuild | October | Committed | $15,500.00 | $0.00 | $0.00 | Prevent further damage | Equipment | Conveyor Chain | Customer Experience | In-Process | EQ-0509-2026-1955 | High | 2026 | Yes | |
| Gary Kingsbury | 500 | 510 | Water Softener | April | Committed | $14,000.00 | $11,552.18 | $2,447.82 | Planned maintenance | Equipment | Water Softener | Wash Quality | Completed | EQ-0510-2025-1264 | Low | 2025 | No | |
| Mason faltysek | 500 | 510 | Entrance Tunnel Heater | October | Committed | $8,000.00 | $9,908.00 | $-1,908.00 | Planned maintenance | Building/Site | Building Facilities | Safety | Ordered | EQ-0510-2025-1581 | High | 2025 | No | |
| Lauren Fine | 500 | 510 | Chain and Roller Conveyor Rebuild | May | Committed | $15,500.00 | $14,749.33 | $750.67 | Prevent further damage | Equipment | Conveyor Chain | Prevent further damage | Completed | EQ-0510-2026-1751 | High | 2026 | Yes | |
| Lauren Fine | 500 | 510 | Replace old Superior Dryers with Sonnys | July | | $65,000.00 | $0.00 | $0.00 | Wash Quality | Equipment | Blowers | | Deferred | | Low | 2026 | No | |
| Phil Loper | 500 | 511 | Conveyor replacement | June | Committed | $100,000.00 | $94,970.58 | $5,029.42 | Planned maintenance | Equipment | Conveyor Chain | Wash Quality | Completed | EQ-0511-2025-1340 | Low | 2025 | No | |
| Lauren Fine | 500 | 511 | Tunnel exit hard door | September | Committed | $14,000.00 | $0.00 | $0.00 | Safety | Building/Site | Facilities Site Work | | Proposal Solicitation | | Medium | 2026 | No | |
| Lauren Fine | 500 | 511 | Building painting | June | | $26,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Building Facilities | | Deferred | | Medium | 2026 | No | |
| Gary Kingsbury | 500 | 512 | Front end conveyor rebuild | N/A | Uncommitted | $25,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Conveyor Chain | Wash Quality | Deferred | | Low | 2025 | No | |
| Lauren Fine | 500 | 512 | Conveyor track and chain (replace entire Conveyor) | January | Committed | $110,000.00 | $77,910.02 | $32,089.98 | Prevent further damage | Equipment | Conveyor Chain | | Completed | EQ-0512-2026-1643 | High | 2026 | Yes | |
| Lauren Fine | 500 | 512 | Tunnel exit hard door | September | Committed | $14,000.00 | $0.00 | $0.00 | Safety | Building/Site | Facilities Site Work | | Proposal Solicitation | | Medium | 2026 | No | |
| Lauren Fine | 500 | 512 | Building painting | June | | $24,500.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Building Facilities | | Deferred | | Medium | 2026 | No | |
| Mason Faltysek | 500 | 513 | Parking lot restripe | N/A | Uncommitted | $6,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Customer Experience | Deferred | | Low | 2025 | No | |
| Benjamin Herr | 500 | 513 | Conveyor Chain, Rollers, Rebuild | April | Committed | $18,500.00 | $22,471.54 | $-3,971.54 | Prevent further damage | Equipment | Conveyor Chain | Prevent further damage | Completed | EQ-0513-2026-1707 | High | 2026 | Yes | |
| Benjamin Herr | 500 | 513 | New Exit Wind Door | October | Committed | $12,816.00 | $0.00 | $0.00 | Safety | Building/Site | Facilities Site Work | Safety | In-Process | EQ-0513-2026-1961 | Medium | 2026 | Yes | |
| Benjamin Herr | 500 | 513 | new concrete around underground tanks | | | $20,000.00 | $0.00 | $0.00 | Safety | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Benjamin Herr | 500 | 513 | Resealing/Striping | | | $7,500.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Building Facilities | | Deferred | | Low | 2026 | No | |
| Benjamin Herr | 500 | 513 | Winter Hut | January | Committed | $4,500.00 | $4,660.36 | $-160.36 | Customer Experience | Building/Site | Facilities Site Work | | Completed | FA-0513-2026-1661 | Medium | 2026 | No | |
| Benjamin Herr | 500 | 513 | (6) StarGate Installation | January | Committed | $13,000.00 | $0.00 | $0.00 | Wash Quality | Equipment | Blowers | Wash Quality | Completed | EQ-0513-2026-1633 | High | 2026 | Yes | |
| Mason Faltysek | 500 | 514 | Parking lot restripe | N/A | Uncommitted | $6,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Customer Experience | Deferred | | Low | 2025 | No | |
| Benjamin Herr | 500 | 514 | New Air Compressor | June | Committed | $17,000.00 | $19,762.33 | $-2,762.33 | Prevent further damage | Equipment | Compressors Replacement | | Completed | EQ-0514-2026-1821 | Medium | 2026 | Yes | |
| Benjamin Herr | 500 | 514 | Chain/Rollers/Gearbox/Conveyor Rebuild | May | Committed | $18,500.00 | $20,939.96 | $-2,439.96 | Prevent further damage | Equipment | Conveyor Chain | | Completed | EQ-0514-2026-1752 | High | 2026 | Yes | |
| Benjamin Herr | 500 | 514 | New Exit Garage Door | October | | $13,000.00 | $0.00 | $0.00 | Prevent further damage | Building/Site | Facilities Site Work | | Proposal Solicitation | | Low | 2026 | No | |
| Benjamin Herr | 500 | 514 | Tunnel Heater | January | Uncommitted | $12,000.00 | $265.02 | $11,734.98 | Wash Quality | Building/Site | Facilities Site Work | | Deferred | FA-0514-2026-1641 | High | 2026 | No | |
| Benjamin Herr | 500 | 514 | Tire Brush Install | April | Committed | $23,000.00 | $21,868.22 | $1,131.78 | Wash Quality | Equipment | Wheel Brush | Wash Quality | Completed | EQ-0514-2026-1708 | Medium | 2026 | Yes | |
| Mason Faltysek | 500 | 515 | Tunnel Liner Wall Panels | July | Committed | $15,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Customer Experience | Completed | | High | 2025 | No | |
| Mason Faltysek | 500 | 516 | Tunnel Liner Wall Panels | July | Committed | $15,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Customer Experience | Completed | | Low | 2025 | No | |
| Mason Faltysek | 500 | 517 | Tunnel Liner Wall Panels | N/A | Committed | $15,500.00 | $16,715.74 | $-1,215.74 | Planned maintenance | Building/Site | Building Facilities | Customer Experience | Completed | FA-0517-2025-1413 | Low | 2025 | No | |
| Lauren Fine | 500 | 517 | Chain and Roller Conveyor Rebuild | October | | $15,500.00 | $0.00 | $0.00 | Prevent further damage | Equipment | Conveyor Chain | | 2026 Request | | High | 2026 | Yes | |
| Lauren Fine | 500 | 517 | Seal and restripe lot | | | $7,500.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Building Facilities | | Deferred | | Low | 2026 | No | |
| Mason Faltysek | 500 | 518 | Tunnel Liner Wall Panels | N/A | Committed | $15,500.00 | $17,387.39 | $-1,887.39 | Planned maintenance | Building/Site | Building Facilities | Customer Experience | Completed | FA-0518-2025-1412 | Low | 2025 | No | |
| Lauren Fine | 500 | 518 | Seal and restripe lot | | | $7,500.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Building Facilities | | Deferred | | Low | 2026 | No | |
| Benjamin Herr | 500 | 519 | conveyor entrance and exit rebuild | October | | $3,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | Conveyor Chain | | 2026 Request | | High | 2026 | No | |
| Benjamin Herr | 500 | 519 | Landscaping - Bushes/Stone | N/A | Uncommitted | $5,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | Deferred | | High | 2026 | No | |
| Mason faltysek | 500 | 520 | Winter Hut | October | Committed | $4,000.00 | $4,188.30 | $-188.30 | Planned maintenance | Building/Site | Building Facilities | Safety | Completed | FA-0520-2025-1501 | Low | 2025 | No | |
| Benjamin Herr | 500 | 520 | conveyor entrance and exit rebuild | August | | $3,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | Conveyor Chain | | 2026 Request | | High | 2026 | No | |
| Mason Faltysek | 500 | 521 | Tunnel Liner Wall Panels | N/A | Committed | $15,500.00 | $27,954.55 | $-12,454.55 | Planned maintenance | Building/Site | Building Facilities | Customer Experience | Completed | FA-0521-2025-1414 | Low | 2025 | No | |
| Lauren Fine | 500 | 521 | Seal and restripe lot | | | $7,500.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Building Facilities | | Deferred | | Low | 2026 | No | |
| Lauren Fine | 500 | 522 | conveyor entrance and exit rebuild | August | | $3,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | Conveyor Chain | | 2026 Request | | High | 2026 | No | |
| Lauren Fine | 500 | 522 | New Walls in wash Bay | May | | $17,500.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Lauren Fine | 500 | 523 | conveyor entrance and exit rebuild | November | | $3,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | Conveyor Chain | | 2026 Request | | High | 2026 | No | |
| Lauren Fine | 500 | 524 | Belt Refresh | January | Committed | $85,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | Conveyor Belt | Customer Experience | Completed | EQ-0524-2025-1571 | High | 2026 | No | |
| Lauren Fine | 500 | 524 | Belt Motor and Gear Box | December | | $20,000.00 | $0.00 | $0.00 | | Equipment | Conveyor Belt | | 2026 Request | | Low | 2026 | No | |
| Lauren Fine | 500 | 524 | New tireshine | April | Committed | $28,000.00 | $32,648.38 | $-4,648.38 | Wash Quality | Equipment | Tire Shine | Wash Quality | Completed | EQ-0524-2026-1710 | High | 2026 | Yes | |
| Mason Faltysek | 600 | 601 | Paint - Repaint exterior of building | N/A | Uncommitted | $15,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Prevent further damage | Deferred | | Low | 2025 | No | |
| Lauren Fine | 600 | 601 | Concrete pour on exit pad | July | Committed | $10,000.00 | $6,015.00 | $3,985.00 | Customer Experience | Building/Site | Facilities Site Work | Customer Experience | Completed | FA-0601-2026-1841 | Medium | 2026 | Yes | |
| Lauren Fine | 600 | 601 | Sump Pump Failure | | | $2,500.00 | $0.00 | $0.00 | | Equipment | | | Deferred | | Low | 2026 | No | |
| Lauren Fine | 600 | 601 | Seal and restripe lot | | | $7,500.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Building Facilities | | Deferred | | Low | 2026 | No | |
| Lauren Fine | 600 | 601 | Replace tunnel heater | January | | $12,000.00 | $0.00 | $0.00 | Prevent further damage | Building/Site | Facilities Site Work | | Deferred | | High | 2026 | No | |
| Lauren Fine | 600 | 602 | Concrete pour on exit pad | July | Committed | $10,000.00 | $8,188.00 | $1,812.00 | Customer Experience | Building/Site | Facilities Site Work | Customer Experience | Completed | FA-0602-2026-1842 | Medium | 2026 | Yes | |
| Lauren Fine | 600 | 602 | Sump Pump Failure | | | $2,500.00 | $0.00 | $0.00 | | Equipment | | | Deferred | | Low | 2026 | No | |
| Lauren Fine | 600 | 602 | Seal and restripe lot | | | $7,500.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Building Facilities | | Deferred | | Low | 2026 | No | |
| Lauren Fine | 600 | 602 | Tunnel Heater | January | | $7,500.00 | $0.00 | $0.00 | Safety | Building/Site | Facilities Site Work | | Deferred | | High | 2026 | No | |
| Benjamin Herr | 700 | 702 | dual motor prep pump | February | Committed | $13,000.00 | $9,029.40 | $3,970.60 | Customer Experience | Equipment | Prep Pump | Wash Quality | Completed | EQ-0702-2026-1677 | High | 2026 | Yes | |
| Mason faltysek | 700 | 703 | Replace wind doors with Gallop | October | Committed | $12,500.00 | $18,304.95 | $-5,804.95 | Planned maintenance | Building/Site | Building Facilities | Safety | Completed | EQ-0703-2025-1459 | Low | 2025 | No | |
| Benjamin Herr | 700 | 703 | Air Compressor | May | Committed | $17,000.00 | $19,775.50 | $-2,775.50 | Prevent further damage | Equipment | Compressors Replacement | Prevent further damage | Completed | EQ-0703-2026-1749 | High | 2026 | Yes | |
| David Carreon | 700 | 704 | Cameras through tunnel to help with damage claims and saftey. | N/A | Uncommitted | $3,000.00 | $0.00 | $0.00 | Planned maintenance | IT | Camera | Safety | Deferred | | Low | 2025 | No | |
| Mason Faltysek | 700 | 704 | Signage - new sign above entrance to tunnel to cover soapy joes up or re-do EFIS | May | Committed | $8,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | marketing/signage | Customer Experience | Completed | | Low | 2025 | No | |
| Mason Faltysek | 700 | 704 | Tunnel Liner Wall Panels | June | Committed | $22,500.00 | $23,168.15 | $-668.15 | Planned maintenance | Building/Site | Building Facilities | Customer Experience | Completed | FA-0704-2025-1339 | Low | 2025 | No | |
| Benjamin Herr | 700 | 704 | Camera Upgrade | May | Committed | $7,000.00 | $10,756.78 | $-3,756.78 | Prevent further damage | IT | Camera | | Completed | EQ-0704-2026-1809 | Medium | 2026 | Yes | |
| Benjamin Herr | 700 | 704 | Entrance tunnel heaters | September | Committed | $12,000.00 | $0.00 | $0.00 | Prevent further damage | Building/Site | Facilities Site Work | Safety | Ordered | EQ-0704-2026-1954 | High | 2026 | Yes | |
| Mason Faltysek | 700 | 705 | Parking lot restripe | N/A | Uncommitted | $6,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Customer Experience | Deferred | | Low | 2025 | No | |
| Gary Kingsbury | 700 | 705 | Replace containment trap covers with open grating | N/A | Uncommitted | $14,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Prevent further damage | Deferred | | Low | 2025 | No | |
| Benjamin Herr | 700 | 705 | Prep Gun Pump Replacement | January | Committed | $8,952.00 | $8,644.53 | $307.47 | Prevent further damage | Equipment | Prep Pump | Wash Quality | Completed | EQ-0705-2026-1630 | Low | 2026 | No | |
| Benjamin Herr | 700 | 705 | Area behind curb in vac area back side of building (Sidewalk/Lanscaping) | May | Committed | $20,000.00 | $14,499.80 | $5,500.20 | Customer Experience | Building/Site | Facilities Site Work | Customer Experience | Completed | FA-0705-2026-1755 | Low | 2026 | Yes | |
| Benjamin Herr | 700 | 705 | Finishing XPT Canopy face | September | Committed | $10,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | Proposal Solicitation | | Low | 2026 | No | |
| Benjamin Herr | 700 | 705 | Concrete pad for towel cart on backside of building | April | Uncommitted | $5,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | Deferred | | Low | 2026 | No | |
| Benjamin Herr | 700 | 705 | Canister Vacs replaced | | | $12,000.00 | $0.00 | $0.00 | Customer Experience | Equipment | | | Deferred | | Low | 2026 | No | |
| Benjamin Herr | 700 | 705 | Concrete at entrance | | | $10,000.00 | $0.00 | $0.00 | Prevent further damage | Building/Site | Facilities Site Work | | 2026 Request | | Medium | 2026 | No | |
| Benjamin Herr | 700 | 705 | Additional Grundfoss pumps | May | Committed | $17,000.00 | $15,644.59 | $1,355.41 | Prevent further damage | Equipment | Hydroflex | Wash Quality | Completed | EQ-0705-2026-1713 | Low | 2026 | Yes | |
| Benjamin Herr | 700 | 706 | Camera system repairs | August | | $3,500.00 | $0.00 | $0.00 | Safety | IT | Camera | | 2026 Request | | Medium | 2026 | No | |
| Benjamin Herr | 700 | 706 | Mitter frame (Whole replacement) | August | Committed | $20,000.00 | $13,500.94 | $6,499.06 | Wash Quality | Equipment | Mitter | Wash Quality | Completed | EQ-0706-2026-1852 | Medium | 2026 | Yes | |
| Gary Kingsbury | 700 | 706 | Replace HP Rinse pump | September | Committed | $4,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | high pressure rinse | Wash Quality | Awaiting Approval | | High | | No | |
| Gary Kingsbury | 700 | 707 | Chain | N/A | Uncommitted | $12,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | chain/roller | Wash Quality | Deferred | | Low | 2025 | No | |
| Gary Kingsbury | 700 | 707 | Floor Heat | October | Committed | $50,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Vacuum | Customer Experience | Completed | | Low | 2025 | No | |
| Mason faltysek | 700 | 707 | Auto Wash Replacement Shroud | November | Committed | $6,000.00 | $8,800.00 | $-2,800.00 | Planned maintenance | Building/Site | Building Facilities | Customer Experience | Completed | FA-0707-2025-1493 | Low | 2025 | No | |
| Benjamin Herr | 700 | 707 | Log Chain Conversion | March | Committed | $13,500.00 | $11,398.54 | $2,101.46 | Prevent further damage | Equipment | Conveyor Chain | | Completed | EQ-0707-2026-1657 | Medium | 2026 | No | |
| Benjamin Herr | 700 | 707 | New boiler and floor heating in SS & autos | N/A | | $20,000.00 | $0.00 | $0.00 | Safety | Building/Site | Facilities Site Work | | Proposal Solicitation | | High | 2026 | No | |
| Benjamin Herr | 700 | 707 | Mitter frame (Whole replacement) | April | Committed | $14,500.00 | $17,187.59 | $-2,687.59 | Wash Quality | Equipment | Mitter | Wash Quality | Completed | EQ-0707-2026-1709 | Medium | 2026 | Yes | |
| Gary Kingsbury | 700 | 709 | Chain | N/A | Uncommitted | $12,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | chain/roller | Wash Quality | Deferred | | Low | 2025 | No | |
| Benjamin Herr | 700 | 709 | Chain and Roller Conveyor Rebuild | April | Committed | $15,500.00 | $12,001.19 | $3,498.81 | Prevent further damage | Equipment | Conveyor Chain | Prevent further damage | Completed | EQ-0709-2026-1712 | Medium | 2026 | Yes | |
| Benjamin Herr | 700 | 709 | Building Painting | May | | $20,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Building Facilities | | Deferred | | Low | 2026 | No | |
| Benjamin Herr | 700 | 709 | tunnel entrance door and exit wind door | August | Committed | $18,000.00 | $0.00 | $0.00 | Safety | Building/Site | Facilities Site Work | Safety | Ordered | EQ-0709-2026-1913 | High | 2026 | Yes | |
| Benjamin Herr | 700 | 709 | Landscaping near XPT | May | | $5,000.00 | $0.00 | $0.00 | Safety | Building/Site | Facilities Site Work | | 2026 Request | | Medium | 2026 | No | |
| Benjamin Herr | 700 | 709 | Mitter frame (Whole replacement) | September | Committed | $30,000.00 | $5,600.00 | $24,400.00 | Wash Quality | Equipment | Mitter | Wash Quality | Ordered | EQ-0709-2026-1939 | Medium | 2026 | Yes | |
| Gary Kingsbury | 700 | 711 | Replace HP water lines to prep with stainless tubing and install double boom. | August | Committed | $15,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | prep pump | Wash Quality | Completed | EQ-0711-2025-1470 | Low | 2025 | No | |
| Benjamin Herr | 700 | 712 | Tunnel Lighting | September | Committed | $10,000.00 | $0.00 | $0.00 | Safety | Building/Site | Facilities Site Work | | Ordered | | Low | 2026 | Yes | |
| Gary Kingsbury | 700 | 712 | Entrance Wind Door | October | Committed | $12,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Building Facilities | Safety | Proposal Solicitation | | High | | No | |
| Gary Kingsbury | 700 | 712 | Chain & Rollers, Conveyor rebuild | September | Committed | $15,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Conveyor Chain | Wash Quality | Proposal Solicitation | | High | | No | |
| Gary Kingsbury | 700 | 712 | Prep Area Tunnel Heat | October | Committed | $20,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Safety | Proposal Solicitation | | High | | No | |
| Mason faltysek | 700 | 713 | Winter Hut | October | Committed | $4,000.00 | $4,125.73 | $-125.73 | Planned maintenance | Building/Site | Building Facilities | Safety | Completed | FA-0713-2025-1502 | Low | 2025 | No | |
| Mason faltysek | 700 | 714 | Winter Hut | October | Committed | $4,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Safety | Completed | FA-0714-2025-1503 | Low | 2025 | No | |
| Benjamin Herr | 700 | 715 | 715 - Winter Hut | January | Committed | $4,500.00 | $4,616.18 | $-116.18 | Safety | Building/Site | Facilities Site Work | Safety | Completed | FA-0715-2026-1621 | High | 2026 | No | |
| Benjamin Herr | 700 | 717 | 717 - Winter Hut | January | Committed | $4,500.00 | $4,583.25 | $-83.25 | Safety | Building/Site | Facilities Site Work | Safety | Completed | FA-0717-2026-1623 | High | 2026 | No | |
| Benjamin Herr | 700 | 718 | Weed Barrier for back mulch bed and replace with Rock | N/A | Uncommitted | $5,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | Deferred | | Low | 2026 | No | |
| Phil Loper | 800 | 801 | Tire Shine | April | Committed | $27,350.00 | $18,214.01 | $9,135.99 | Planned maintenance | Equipment | Tire Shine | Wash Quality | Completed | EQ-0801-2025-1226 | Low | 2025 | No | |
| David Carreon | 800 | 801 | LPR Server upgrade from Windows to Linux (No Longer Supported, No update for bug fix available) | May | Committed | $1,600.00 | $11,318.41 | $-9,718.41 | Planned maintenance | IT | Technology | Safety | Completed | EQ-0801-2025-1294 | Low | 2025 | No | |
| Mason Faltysek | 800 | 801 | Parking lot restripe | N/A | Uncommitted | $6,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Customer Experience | Deferred | | Low | 2025 | No | |
| Caleb Harris | 800 | 801 | Spare Market Compressor | January | Committed | $6,000.00 | $4,026.17 | $1,973.83 | Prevent further damage | Equipment | Compressors Replacement | Wash Quality | Completed | EQ-0801-2026-1638 | Low | 2026 | Yes | |
| David Carreon | 800 | 802 | LPR Server upgrade from Windows to Linux (No Longer Supported, No update for bug fix available) | May | Committed | $1,600.00 | $11,318.41 | $-9,718.41 | Planned maintenance | IT | Technology | Safety | Completed | EQ-0801-2025-1294 | Low | 2025 | No | |
| Caleb Harris | 800 | 802 | Touch IT upgrade from Win7 | April | Uncommitted | $4,995.00 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | Deferred | | Medium | 2026 | No | |
| Caleb Harris | 800 | 802 | 2 AutoSentry upgrades from Win7 | July | Uncommitted | $3,348.46 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | Deferred | | Medium | 2026 | No | |
| Caleb Harris | 800 | 802 | POS upgrade from Win7 (PC only) | April | Uncommitted | $2,450.00 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | Deferred | | Medium | 2026 | No | |
| David Carreon | 800 | 802 | Tablet Project | May | Committed | $12,000.00 | $11,414.85 | $585.15 | Planned maintenance | | Technology | | Awaiting Approval | EQ-0802-2026-1807 | High | | No | |
| David Carreon | 800 | 802 | Tablet Set up | May | Committed | $12,000.00 | $11,414.85 | $585.15 | Planned maintenance | IT | | Customer Experience | Completed | EQ-0802-2026-1807 | High | | No | |
| David Carreon | 800 | 803 | LPR Server upgrade from Windows to Linux (No Longer Supported, No update for bug fix available) | May | Committed | $1,600.00 | $11,318.41 | $-9,718.41 | Planned maintenance | IT | Technology | Safety | Completed | EQ-0801-2025-1294 | Low | 2025 | No | |
| Caleb Harris | 800 | 803 | Add doors to dumpster enclosure | N/A | Uncommitted | $10,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | Deferred | | Low | 2026 | No | |
| Caleb Harris | 800 | 803 | Touch IT upgrade from Win7 | August | Committed | $4,995.00 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | 2026 Request | | Medium | 2026 | No | |
| Caleb Harris | 800 | 803 | 2 AutoSentry upgrades from Win7 | August | Committed | $3,348.46 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | 2026 Request | | Medium | 2026 | No | |
| Caleb Harris | 800 | 804 | Chain and Roller Conveyor Rebuild | July | Committed | $13,500.00 | $11,668.54 | $1,831.46 | Prevent further damage | Equipment | Conveyor Chain | | Completed | EQ-0804-2026-1890 | Medium | 2026 | Yes | |
| Caleb Harris | 800 | 804 | 1 AutoSentry upgrade from Win7 Lane2 | June | Committed | $2,038.00 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | Completed | | Medium | 2026 | No | |
| Caleb Harris | 800 | 804 | Vac Motor Star Cabinet (remove VFD and add starters) | | | $5,300.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | Medium | 2026 | No | |
| David Carreon | 800 | 805 | LPR Server upgrade from Windows to Linux (No Longer Supported, No update for bug fix available) | June | Committed | $1,600.00 | $11,318.41 | $-9,718.41 | Planned maintenance | IT | Technology | Safety | Completed | EQ-0801-2025-1294 | Low | 2025 | No | |
| Caleb Harris | 800 | 805 | Compressor | April | Committed | $4,104.84 | $4,236.84 | $-132.00 | Prevent further damage | Equipment | Compressors Replacement | | Completed | EQ-0805-2026-1711 | Medium | 2026 | Yes | |
| Caleb Harris | 800 | 805 | Vac Motor Star Cabinet (remove VFD and add starters) | | | $5,300.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | Medium | 2026 | No | |
| Caleb Harris | 800 | 805 | Chain and Roller Conveyor Rebuild | April | Committed | $10,500.00 | $11,559.92 | $-1,059.92 | Prevent further damage | Equipment | Conveyor Chain | | Completed | EQ-0805-2026-1714 | Medium | 2026 | Yes | |
| Caleb Harris | 800 | 805 | Ceiling panel replacement/repair | July | Committed | $5,000.00 | $17,076.34 | $-12,076.34 | Prevent further damage | Building/Site | Facilities Site Work | Safety | Completed | EQ-0805-2026-1815 | Medium | 2026 | Yes | |
| Caleb Harris | 800 | 805 | 1 AutoSentry upgrades from Win7 | N/A | | $2,038.00 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | Deferred | | Medium | 2026 | No | |
| David Carreon | 800 | 806 | LPR Server upgrade from Windows to Linux (No Longer Supported, No update for bug fix available) | June | Committed | $1,600.00 | $11,318.41 | $-9,718.41 | Planned maintenance | IT | Technology | Safety | Completed | EQ-0801-2025-1294 | Low | 2025 | No | |
| Caleb Harris | 800 | 806 | Chain and Roller Conveyor Rebuild | September | Committed | $13,500.00 | $0.00 | $0.00 | Prevent further damage | Equipment | Conveyor Chain | | 2026 Request | | Low | 2026 | Yes | |
| Mason Faltysek | 800 | 807 | Repair concrete Driveway | N/A | Committed | $0.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Prevent further damage | Completed | | Low | 2025 | No | |
| Mason Faltysek | 800 | 807 | Landscaping: mulch beds | N/A | Uncommitted | $2,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Prevent further damage | Deferred | | Low | 2025 | No | |
| David Carreon | 800 | 807 | LPR Server upgrade from Windows to Linux (No Longer Supported, No update for bug fix available) | June | Committed | $1,600.00 | $11,318.41 | $-9,718.41 | Planned maintenance | IT | Technology | Safety | Completed | EQ-0801-2025-1294 | Low | 2025 | No | |
| Caleb Harris | 800 | 807 | Soft Start VAc cabinets to replace VFDs | | | $5,300.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | Low | 2026 | No | |
| Caleb Harris | 800 | 807 | Add doors to dumpster enclosure | | | $10,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| Caleb Harris | 800 | 807 | Touch IT from Win7 | October | | $4,995.00 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | 2026 Request | | Low | 2026 | No | |
| Caleb Harris | 800 | 807 | 2 AutoSentry upgrades from Win7 | October | | $4,076.00 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | 2026 Request | | Medium | 2026 | No | |
| David Carreon | 800 | 808 | Cameras, back of property cameras | N/A | Uncommitted | $2,500.00 | $0.00 | $0.00 | Planned maintenance | IT | Camera | Safety | Deferred | | Low | 2025 | No | |
| Abel Smith | 800 | 808 | Chain - New chain/rollers/drum/sprocket - convert to log chain | August | Committed | $12,000.00 | $10,133.50 | $1,866.50 | Planned maintenance | Equipment | chain/roller | Wash Quality | Completed | EQ-0808-2025-1432 | Low | 2025 | No | |
| Caleb Harris | 800 | 808 | Additional JKo Mat Machine | May | Committed | $5,500.00 | $5,686.80 | $-186.80 | Customer Experience | Building/Site | Facilities Site Work | | Completed | EQ-0808-2026-1723 | Low | 2026 | Yes | |
| Caleb Harris | 800 | 808 | Mini Seperator Replacement | January | Committed | $15,000.00 | $12,857.63 | $2,142.37 | Prevent further damage | Equipment | Vacuum | Customer Experience | Completed | EQ-0808-2026-1616 | Medium | 2026 | No | |
| Mason Faltysek | 800 | 809 | Parking lot restripe | N/A | Uncommitted | $6,500.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Facilities Site Work | Customer Experience | Deferred | | Low | 2025 | No | |
| caleb Harris | 800 | 809 | Concrete work Tunnel Exit | | | $12,500.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | 2026 Request | | Medium | 2026 | No | |
| Caleb Harris | 800 | 809 | Tablet and networking set up | March | Committed | $10,000.00 | $12,323.52 | $-2,323.52 | Customer Experience | IT | Technology | | Completed | EQ-0809-2026-1717 | Medium | 2026 | Yes | |
| Caleb Harris | 800 | 809 | Standalone POS with PAX reader at pay stations. (SAL) | N/A | Uncommitted | $5,000.00 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | 2026 Request | | Medium | 2026 | No | |
| Caleb Harris | 800 | 809 | Touch IT upgrade from Win7 | March | Uncommitted | $4,995.00 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | Deferred | | Medium | 2026 | No | |
| Caleb Harris | 800 | 809 | 2 AutoSentry upgrade from Win7 | March | Uncommitted | $4,076.00 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | Deferred | | Medium | 2026 | No | |
| Caleb Harris | 800 | 809 | POS upgrade from Win7 (PC only) | March | Uncommitted | $2,450.00 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | Deferred | | Medium | 2026 | No | |
| Caleb Harris | 800 | 809 | 40 HP Producer | N/A | | $20,000.00 | $0.00 | $0.00 | Prevent further damage | Equipment | | | 2026 Request | | High | 2026 | Yes | |
| Abel Smith | 800 | 810 | Vacuum - New 50HP Vacutech Producer | April | Committed | $30,000.00 | $30,359.85 | $-359.85 | Planned maintenance | Equipment | Vacuum | Customer Experience | Completed | EQ-0810-2025-1184 | Low | 2025 | No | |
| Caleb Harris | 800 | 810 | Add POS enclosure at XPTs | N/A | Uncommitted | $10,000.00 | $0.00 | $0.00 | Customer Experience | IT | Technology | | Deferred | | Medium | 2026 | No | |
| Caleb Harris | 800 | 811 | Exit Gate Installation | | | $10,000.00 | $0.00 | $0.00 | Customer Experience | Building/Site | Facilities Site Work | | 2026 Request | | Low | 2026 | No | |
| David Carreon | 800 | 814 | Damage Claim Camera Arch | N/A | Uncommitted | $3,000.00 | $0.00 | $0.00 | Planned maintenance | IT | Camera | Safety | Deferred | | Low | 2025 | No | |
| David Carreon | 800 | 814 | Laguna Tunnel Controller or Washlink PC upgrade | Complete February | Committed | $6,500.00 | $5,555.36 | $944.64 | Planned maintenance | IT | Technology | Customer Experience | Completed | EQ-0814-2025-1203 | Low | 2025 | No | |
| David Carreon | 800 | 814 | LPR Server upgrade from Windows to Linux (No Longer Supported, No update for bug fix available) | N/A | Committed | $1,600.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Technology | Safety | Completed | | Low | 2025 | No | |
| Abel Smith | 800 | 814 | Dual Prep Unit | November | Committed | $13,500.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Prep Pump | Customer Experience | Completed | | Low | 2025 | No | |
| Caleb Harris | 800 | 814 | 2 AutoSentry upgrades from Win7 | September | Committed | $4,076.00 | $0.00 | $0.00 | Prevent further damage | IT | Technology | | 2026 Request | | Medium | 2026 | No | |
| Andrew Folse | 800 | 816 | High Pressure Pump Replacement | September | Committed | $11,242.32 | $0.00 | $0.00 | Planned maintenance | | high pressure pump | | Awaiting Approval | | High | | No | |
| Andrew Folse | 800 | 817 | High Pressure Pump Replacement | September | Committed | $11,242.32 | $0.00 | $0.00 | Planned maintenance | Equipment | | Prevent further damage | In-Process | EQ-0817-2026-1938 | High | | No | |
| Chase Cursey | 100 | 901 | Test Vacuum | July | Uncommitted | $13,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Vacuum | Customer Experience | Deferred | | Medium | | No | |
| Chase Cursey | 100 | 901 | Updated Towel Dispensers | October | Uncommitted | $12,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Vacuum | Customer Experience | Awaiting Approval | | Low | | No | |
| Chase Cursey | 100 | 902 | Overhead Vacuum Lines | September | Uncommitted | $13,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Vacuum | Customer Experience | Awaiting Approval | | Medium | | No | |
| Chase Cursey | 100 | 902 | Updated Towel Dispensers | January | Uncommitted | $8,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Vacuum | Customer Experience | Awaiting Approval | | Low | | No | |
| Chase Cursey | 100 | 903 | Updated Towel Dispensers | October | Uncommitted | $9,600.00 | $0.00 | $0.00 | Planned maintenance | | | | Awaiting Approval | | High | | No | |
| Chase Cursey | 100 | 903 | Overhead Vacuum Lines | October | Uncommitted | $13,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Vacuum | Customer Experience | Awaiting Approval | | High | | No | |
| Chase Cursey | 100 | 903 | Front Wheel Push Conversion | October | Uncommitted | $15,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Conveyor Chain | Customer Experience | Awaiting Approval | | Medium | | No | |
| Chase Cursey | 100 | 904 | Updated Towel Dispensers | October | Uncommitted | $8,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Vacuum | Customer Experience | Awaiting Approval | | Low | | No | |
| Chase Cursey | 100 | 904 | Lobby Renovation | October | Uncommitted | $10,000.00 | $0.00 | $0.00 | Planned maintenance | Building/Site | Building Facilities | Customer Experience | Awaiting Approval | | Low | | No | |
| Chase Cursey | 100 | 904 | Front Wheel Push Conversion | October | Uncommitted | $15,000.00 | $0.00 | $0.00 | Planned maintenance | Equipment | Conveyor Chain | Customer Experience | Awaiting Approval | | High | | No | |
| Chase Cursey | 100 | 905 | Updated Towel Dispensers | October | Uncommitted | $8,000.00 | $0.00 | $0.00 | Unplanned | Equipment | Vacuum | Customer Experience | Awaiting Approval | | Low | | No | |
| Chase Cursey | 100 | 905 | Vacuum Canopy Paint and Vinyl Decals | October | Uncommitted | $12,500.00 | $0.00 | $0.00 | Unplanned | Building/Site | Building Facilities | Customer Experience | Awaiting Approval | | Medium | | No | |
| Chase Cursey | 100 | 906 | Updated Towel Dispensers | October | Uncommitted | $8,000.00 | $0.00 | $0.00 | Unplanned | Equipment | Vacuum | Customer Experience | Awaiting Approval | | Low | | No | |
| Chase Cursey | 100 | 907 | Updated Towel Dispensers | October | Uncommitted | $8,000.00 | $0.00 | $0.00 | Unplanned | Equipment | Vacuum | Customer Experience | Awaiting Approval | | Low | | No | |
| Chase Cursey | 100 | 907 | Front Wheel Push Conversion | October | Uncommitted | $10,000.00 | $0.00 | $0.00 | Unplanned | Equipment | Conveyor Chain | Customer Experience | Awaiting Approval | | Low | | No | |
| Chase Cursey | 100 | 908 | Vacuum Canopy Paint and Vinyl | October | Uncommitted | $12,000.00 | $0.00 | $0.00 | Unplanned | Building/Site | Building Facilities | Customer Experience | Awaiting Approval | | Low | | No | |
| Chase Cursey | 100 | 908 | Updated Towel Dispensers | October | Uncommitted | $8,000.00 | $0.00 | $0.00 | Unplanned | Equipment | Vacuum | Customer Experience | Awaiting Approval | | Low | | No | |
| Chase Cursey | 100 | 908 | Front Wheel Push Conversion | October | Uncommitted | $10,000.00 | $0.00 | $0.00 | Unplanned | Equipment | Conveyor Chain | Customer Experience | Awaiting Approval | | Low | | No | |
| Chase Cursey | 100 | 909 | Vacuum Canopy Paint and Vinyl | October | Uncommitted | $6,800.00 | $0.00 | $0.00 | Unplanned | Building/Site | Building Facilities | Customer Experience | Awaiting Approval | | Low | | No | |
| Chase Cursey | 100 | 909 | Front Wheel Push Conversion | October | Uncommitted | $10,000.00 | $0.00 | $0.00 | Unplanned | Equipment | Conveyor Chain | Customer Experience | Awaiting Approval | | Low | | No | |
| Chase Cursey | 100 | 910 | Vacuum Canopy Paint and Vinyl | October | Uncommitted | $15,000.00 | $0.00 | $0.00 | Unplanned | Building/Site | Building Facilities | Customer Experience | Awaiting Approval | | Low | | No | |
| Grand Total | $9,255,850.17 | $2,692,786.49 | $-139,890.88 | | | | | | | | | |